[{"id":"cerro-solo","name":"Cerro Solo","short":"Cerro Solo","country":"Argentina","iso2":"AR","region":"Chubut","lat":-43.33,"lon":-68.75,"operator":"CNEA","owners":[{"name":"Comisión Nacional de Energía Atómica (CNEA)","pct":100}],"tickers":["CNEA (state)"],"method":"open-pit","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2033,"late":2040},"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"On standby; Chubut province bans open-pit mining; CNEA feasibility work from 2018 did not proceed","note":"Sandstone deposit with 4,600 tU reasonably assured. Blocked by Chubut's open-pit ban; state oil company YPF created YPF Nuclear in July 2025 to pursue uranium mining in Chubut. Listed as a prospective production centre 'in standby' in the 2026 Red Book. No pub","rg":"South America","own":{"South America":100}},{"id":"ivana-amarillo-grande","name":"Ivana (Amarillo Grande)","short":"Ivana","country":"Argentina","iso2":"AR","region":"Río Negro","lat":-40.47,"lon":-66.15,"operator":"Ivana Minerales S.A. (Blue Sky Uranium / COAM JV)","owners":[{"name":"Blue Sky Uranium","pct":null},{"name":"Abatare Spain (Corporación América, COAM) - earning 49.9%, option to 80%","pct":null}],"tickers":["TSXV:BSK","CORPORACION AMERICA (private)"],"method":"open-pit","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2030,"late":2034},"planned_output_tu":{"low":null,"base":577,"high":null},"ramp_years":1,"expected_end_year":null,"cost_usd_lb":{"cash":23.29,"aisc":24.95,"basis":"Feb 2024 PEA, LOM average net of V2O5 credits (+/-35%)","year":2024},"permitting_stage":"PEA (Feb 2024); gap analysis (Nov 2025) set a ~24-month, US$13.45M roadmap to feasibility; infill drilling done Jan 2026; M3 Engineering and SRC engaged May 2026 for PFS/FS; mining rights transferred to JV company","note":"Best-placed candidate for Argentina's first uranium production since 1997. 2024 PEA: shallow open pit, 1.5 Mlb U3O8/yr over 11 years (16.5 Mlb LOM plus 5.2 Mlb V2O5), pre-production capex US$159.7M, two-year build. COAM can earn 49.9% by funding US$35M and up ","rg":"South America","own":{"South America":100}},{"id":"laguna-salada","name":"Laguna Salada","short":"Laguna Salada","country":"Argentina","iso2":"AR","region":"Chubut","lat":-44.4,"lon":-67.2,"operator":"Jaguar Uranium","owners":[{"name":"Jaguar Uranium","pct":100}],"tickers":["NYSEAMERICAN:JAGU"],"method":"open-pit","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2034,"late":2040},"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Exploration stage; EIA approved for La Rosada prospect (Sep 2026); Chubut open-pit ban applies; no economic study","note":"Surficial U-V gravels (ex-U3O8 Corp), acquired by Jaguar Uranium in 2024. Maiden S-K 1300 / NI 43-101 resource (effective 5 Oct 2026): ~4.2 Mlb U3O8 indicated + ~10.2 Mlb inferred at only 75-205 ppm, with larger vanadium content. Early stage and low grade - in","rg":"South America","own":{"South America":100}},{"id":"sierra-pintada","name":"Sierra Pintada (San Rafael complex)","short":"Sierra Pintada","country":"Argentina","iso2":"AR","region":"Mendoza","lat":-34.65,"lon":-68.65,"operator":"CNEA","owners":[{"name":"Comisión Nacional de Energía Atómica (CNEA)","pct":100}],"tickers":["CNEA (state)"],"method":"open-pit","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2030,"late":2037},"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Idle since 1997; remediation of legacy wastes (a precondition for restart) under way in 2026; provincial environmental approval still required","note":"Argentina's last producing uranium complex (open pit + heap leach), shut 1997; the country has had no production since. The government made resuming uranium mining a priority in May 2026 and CNEA aimed to sign agreements with private partners by end-2026; the ","rg":"South America","own":{"South America":100}},{"id":"bigrlyi","name":"Bigrlyi","short":"Bigrlyi","country":"Australia","iso2":"AU","region":"Northern Territory (Ngalia Basin)","lat":-22.1,"lon":131.5,"operator":"Energy Metals","owners":[{"name":"Energy Metals (CGN-controlled)","pct":72.57},{"name":"Northern Territory Uranium / Noble Investments","pct":27.43}],"tickers":["ASX:EME","CGN (state)"],"method":"open-pit","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2034,"late":2042},"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Exploration licences in retention; mineral lease application MLNA1952 pending; no current feasibility study","note":"Sandstone-hosted U-V deposit 350 km NW of Alice Springs; 2025 resource 7.94 Mt at 1,370 ppm for 23.9 Mlb U3O8 (500 ppm cut-off). NT permits uranium mining. Energy Metals is majority-owned by China General Nuclear's uranium arm, giving a captive customer but no","rg":"Australia","own":{"China":72.6,"Australia":27.4}},{"id":"four-mile-beverley","name":"Four Mile (Beverley plant)","short":"Four Mile","country":"Australia","iso2":"AU","region":"South Australia (Frome Embayment)","lat":-30.147,"lon":139.507,"operator":"Heathgate Resources","owners":[{"name":"Quasar Resources (General Atomics affiliate)","pct":100}],"tickers":["GENERAL ATOMICS (private)"],"method":"ISR","status":"operating","production_tu":{"2019":1764,"2020":1806,"2021":2241,"2022":1740,"2023":1761,"2024":1808,"2025":1600},"capacity_tu":2250,"first_production_year":2014,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"private company; unpublished","year":null},"permitting_stage":null,"note":"Private (General Atomics): no company production reports. 2019-20 = WNA per-mine table (2,080 / 2,130 t U3O8 x 0.848). 2021 = WNA per-mine 2021 column, which is in tU (sums to the 4,192 tU national total). 2022 and 2023 are est. = WNA/Geoscience Australia nati","rg":"Australia","own":{"North America":100}},{"id":"honeymoon","name":"Honeymoon","short":"Honeymoon","country":"Australia","iso2":"AU","region":"South Australia (Curnamona Province)","lat":-31.741,"lon":140.662,"operator":"Boss Energy","owners":[{"name":"Boss Energy","pct":100}],"tickers":["ASX:BOE"],"method":"ISR","status":"operating","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":110,"2025":572},"capacity_tu":942,"first_production_year":2011,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2034,"cost_usd_lb":{"cash":37,"aisc":61,"basis":"FY27 guidance midpoints (C1 US$35-39, AISC US$58-64/lb); FY26 actual A$39 C1 / A$61 AISC per lb","year":2026},"permitting_stage":null,"note":"Restarted April 2024 (earlier operation 2011-13 under Uranium One). June fiscal year converted to calendar from quarterlies (drummed lb U3O8): 2025 = 295,819 + 349,188 + 385,910 + 455,791 = 1,486,708 lb. 2024 is est. (~285 klb): FY25 H1 derived (~228 klb = FY2","guidance_tu":{"2026":{"low":481,"high":500}},"rg":"Australia","own":{"Australia":100}},{"id":"honeymoon-satellites","name":"Honeymoon satellites (Jason's Deposit & Gould's Dam)","short":"Honeymoon satellites","country":"Australia","iso2":"AU","region":"South Australia (Curnamona Province)","lat":-31.25,"lon":140.05,"operator":"Boss Energy","owners":[{"name":"Boss Energy","pct":100}],"tickers":["ASX:BOE"],"method":"ISR","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2029,"late":2033},"planned_output_tu":{"low":null,"base":385,"high":null},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":45,"basis":"aspirational hub-wide AISC A$65/lb (US$45) - Boss Market Day Sept 2026, not a study estimate","year":2026},"permitting_stage":"Exploration licence EL 6512; Honeymoon Mine Extension EPBC referral lodged (decision expected Dec-2026 quarter); Jason's EPBC referral in preparation; Gould's Dam studies ongoing; mining lease applications not yet lodged","note":"Boss aspires to a Honeymoon 'production hub' of 2.5 Mlb/yr at AISC ~A$65/lb by the early 2030s by trucking resin/feeding Jason's (13 km north, 10.7 Mlb inferred) and Gould's Dam (80 km NW, ~25 Mlb) through the existing plant. planned_output base is est. = 2.5 ","rg":"Australia","own":{"Australia":100}},{"id":"kintyre","name":"Kintyre","short":"Kintyre","country":"Australia","iso2":"AU","region":"Western Australia (East Pilbara)","lat":-22.34,"lon":122.07,"operator":"Cameco","owners":[{"name":"Cameco","pct":100}],"tickers":["CCJ"],"method":"open-pit","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2036,"late":2045},"planned_output_tu":{"low":null,"base":2290,"high":null},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"WA approval (2015) lapsed: substantial commencement not achieved by Mar 2020 and extension declined; federal approval (2015) valid to 2045; WA policy bars new uranium mines","note":"Shelved since 2012. 53.5 Mlb indicated at 0.62% plus 6.0 Mlb inferred. WNA cites 2,700-3,600 t U3O8/yr originally envisaged; the lower end is used as base because the resource is only 59.5 Mlb. No current study and no work planned in 2026. Coords approx.","rg":"Australia","own":{"North America":100}},{"id":"manyingee-carley-bore","name":"Manyingee / Carley Bore","short":"Manyingee / Carley Bore","country":"Australia","iso2":"AU","region":"Western Australia (Carnarvon Basin)","lat":-22.42,"lon":115.5,"operator":"Paladin Energy","owners":[{"name":"Paladin Energy","pct":100}],"tickers":["ASX:PDN","TSX:PDN"],"method":"ISR","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2034,"late":2042},"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Three granted mining leases at Manyingee (pre-date the 2017 ban) but WA has a no-development uranium policy; needs field leach trial, feasibility study and state approval","note":"Paladin says Manyingee could be developed as an ISR mine over a 4-5 year timeframe once policy allows (resource drilling, field leach trial, FS); no output or cost study published. Manyingee 25.9 Mlb (15.7 indicated, 10.2 inferred at 850 ppm); Carley Bore 15.6","rg":"Australia","own":{"Australia":100}},{"id":"mulga-rock","name":"Mulga Rock","short":"Mulga Rock","country":"Australia","iso2":"AU","region":"Western Australia (Great Victoria Desert)","lat":-29.97,"lon":123.8,"operator":"Deep Yellow","owners":[{"name":"Deep Yellow","pct":100}],"tickers":["ASX:DYL"],"method":"open-pit","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2031,"late":2035},"planned_output_tu":{"low":null,"base":1346,"high":null},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"WA Ministerial approval (Dec 2016) and federal EPBC approval (2017); 'substantial commencement' confirmed by WA regulator in 2021 so approval survives the 2017 WA ban on new uranium mines; revised DFS/optimisation study ongoing; no FID","note":"Only WA uranium project that can legally proceed. Previous (Vimy) DFS: ~3.5 Mlb U3O8/yr over 15 years; Deep Yellow is re-scoping it as a polymetallic operation with critical-mineral by-products. Geoscience Australia reported a 2028 start (AECR 2025) and a revi","rg":"Australia","own":{"Australia":100}},{"id":"olympic-dam","name":"Olympic Dam","short":"Olympic Dam","country":"Australia","iso2":"AU","region":"South Australia (Gawler Craton)","lat":-30.44,"lon":136.873,"operator":"BHP","owners":[{"name":"BHP","pct":100}],"tickers":["BHP"],"method":"byproduct","status":"operating","production_tu":{"2019":3364,"2020":3062,"2021":1922,"2022":2813,"2023":2932,"2024":2704,"2025":2950},"capacity_tu":3901,"first_production_year":1988,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"by-product of copper; no uranium unit cost published","year":null},"permitting_stage":null,"note":"Calendar-year tU built from BHP quarterly 'payable uranium' (t uranium oxide concentrate x 0.848): 2019 3,967 t; 2020 3,611; 2021 2,266 (smelter campaign maintenance); 2022 3,317; 2023 3,457; 2024 3,189; 2025 3,479 t UOC. WNA shows 2,693 tU for 2024 (vs 2,704 ","rg":"Australia","own":{"Australia":100}},{"id":"ranger","name":"Ranger","short":"Ranger","country":"Australia","iso2":"AU","region":"Northern Territory (Alligator Rivers)","lat":-12.683,"lon":132.917,"operator":"Energy Resources of Australia (ERA)","owners":[{"name":"Energy Resources of Australia (Rio Tinto >98%)","pct":100}],"tickers":["ASX:ERA","RIO"],"method":"open-pit","status":"closed","production_tu":{"2019":1485,"2020":1335,"2021":29,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":4664,"first_production_year":1981,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2021,"cost_usd_lb":null,"permitting_stage":null,"note":"Processing of stockpiles ended 8 Jan 2021 when the Ranger Authority expired; site in rehabilitation (ERA funded to ~Q4 2027; 2026 Mine Closure Plan released 1 Oct 2026). 2019-20 from WNA per-mine table (t U3O8 x 0.848); 2021 = 29 tU (WNA). Rio Tinto's compulso","rg":"Australia","own":{"Australia":100}},{"id":"samphire","name":"Samphire (Blackbush / Plumbush)","short":"Samphire","country":"Australia","iso2":"AU","region":"South Australia (Eyre Peninsula)","lat":-33.17,"lon":137.45,"operator":"Alligator Energy","owners":[{"name":"Alligator Energy","pct":100}],"tickers":["ASX:AGE"],"method":"ISR","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2029,"late":2032},"planned_output_tu":{"low":null,"base":462,"high":null},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Retention lease RL137 (2025); field recovery trial completed Jul 2026; federal EPBC referral lodged 17 Nov 2026; mining lease application and feasibility study in progress; no FID","note":"Most advanced new Australian project in a mining-friendly state. Field Recovery Trial ran Feb-Jul 2026: pattern 1 reached ~70% recovery at ~70 pore volumes with full flowsheet (IX, elution) proven. Resource grew to 30 Mlb (18 Mlb Blackbush + 12 Mlb Plumbush) i","rg":"Australia","own":{"Australia":100}},{"id":"valhalla-mount-isa","name":"Valhalla / Mount Isa","short":"Valhalla / Mount Isa","country":"Australia","iso2":"AU","region":"Queensland (Mount Isa Inlier)","lat":-20.39,"lon":139.37,"operator":"Paladin Energy","owners":[{"name":"Paladin Energy","pct":100}],"tickers":["ASX:PDN","TSX:PDN"],"method":"open-pit","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2037,"late":2045},"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Exploration only: Queensland permits uranium exploration but bans uranium mining; no mining lease possible","note":"Blocked by state policy. Mount Isa deposits total ~148 Mlb U3O8 (Valhalla alone 76.2 Mlb: 28.9 measured, 34.5 indicated, 12.8 inferred; plus Skal, Odin, Bikini and others) at 30 Jun 2026. No economic study or timetable; Paladin's capital is going to Langer Hei","rg":"Australia","own":{"Australia":100}},{"id":"westmoreland","name":"Westmoreland","short":"Westmoreland","country":"Australia","iso2":"AU","region":"Queensland (NW, near NT border)","lat":-17.5,"lon":138.25,"operator":"Laramide Resources","owners":[{"name":"Laramide Resources","pct":100}],"tickers":["TSX:LAM","ASX:LAM"],"method":"open-pit","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2034,"late":2042},"planned_output_tu":{"low":null,"base":1885,"high":2385},"ramp_years":1,"expected_end_year":null,"cost_usd_lb":{"cash":32.4,"aisc":null,"basis":"July 2026 updated PEA, average C1 (US$90/lb price deck; +/-35%)","year":2026},"permitting_stage":"Exploration tenure only; Queensland bans uranium mining - Laramide says it will lodge a Mining Lease Application 'as soon as permitted by the Queensland Government'","note":"Updated PEA (22 Jul 2026; NI 43-101 report filed 3 Sep 2026): 11-year open pit, 2.9 Mtpa mill, average 4.9 Mlb U3O8/yr (years 2-10; peak 6.2 Mlb in year 2), 47.9 Mlb LOM, initial capex US$456M plus US$84M contingency, C1 US$32.40/lb, post-tax NPV7.5 US$741M. R","rg":"Australia","own":{"Australia":100}},{"id":"wiluna-lake-maitland","name":"Wiluna / Lake Maitland","short":"Wiluna / Lake Maitland","country":"Australia","iso2":"AU","region":"Western Australia (Northern Goldfields)","lat":-27.18,"lon":121.083,"operator":"IsoEnergy (ex-Toro Energy)","owners":[{"name":"IsoEnergy","pct":100}],"tickers":["TSX:ISO"],"method":"open-pit","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2033,"late":2040},"planned_output_tu":{"low":null,"base":500,"high":763},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Wiluna (Lake Way/Centipede-Millipede/Lake Maitland) received WA approval Jan 2017 as one of four projects grandfathered from the 2017 ban, but the current Lake Maitland stand-alone U-V design would need fresh or amended approvals; scoping-study stage","note":"IsoEnergy completed its acquisition of Toro Energy on 25 Jun 2026 (Toro delisted from ASX). Resource 73.6 Mlb U3O8 (69.1 Mlb M&I; 'historical' under NI 43-101) plus 89.3 Mlb V2O5; IsoEnergy plans a new NI 43-101 resource and is weighing a multi-deposit scenari","rg":"Australia","own":{"North America":100}},{"id":"yeelirrie","name":"Yeelirrie","short":"Yeelirrie","country":"Australia","iso2":"AU","region":"Western Australia (Northern Goldfields)","lat":-27.178,"lon":119.913,"operator":"Cameco","owners":[{"name":"Cameco","pct":100}],"tickers":["CCJ"],"method":"open-pit","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2036,"late":2045},"planned_output_tu":{"low":null,"base":null,"high":6360},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"WA approval (Jan 2017) lapsed: substantial commencement not achieved by Jan 2022 and the state declined an extension; federal approval (2019) valid to 2043; WA policy bars new uranium mines","note":"Shelved. Cameco: 'No work is planned at Millennium, Yeelirrie or Kintyre in 2026'; needs a future WA government to grant a new extension. 128.1 Mlb M&I at 0.15% U3O8. 'high' output is the 7,500 t U3O8/yr design in Cameco's 2014 EPA application (WNA); no curren","rg":"Australia","own":{"North America":100}},{"id":"letlhakane","name":"Letlhakane","short":"Letlhakane","country":"Botswana","iso2":"BW","region":"Central District (near Serule / Francistown)","lat":-21.857,"lon":27.201,"operator":"Lotus Resources","owners":[{"name":"Lotus Resources","pct":100}],"tickers":["LOT"],"method":"heap-leach","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2032,"late":2037},"planned_output_tu":{"low":null,"base":1154,"high":1154},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"scoping-study costs not captured; optimisation of acid consumption/flowsheet ongoing","year":null},"permitting_stage":"22-year mining licence (2016) and approved EIS (2016) from A-Cap era; updated scoping study March 2025; pre-feasibility study slipped from 2H 2026 to 1H 2027.","note":"Large, low-grade (363 ppm U3O8) calcrete/mudstone deposit: 113.7 Mlb resource (Dec 2024). Scoping study (Mar 2025): ~3 Mlb U3O8/yr (1,154 tU) over 10 years. Second priority for Lotus, which is cash-constrained while Kayelekera ramps up; PFS now due 1H 2027. st","rg":"Africa","own":{"Australia":100}},{"id":"caetite-lagoa-real","name":"Caetité / Lagoa Real (Engenho mine)","short":"Caetité / Lagoa Real","country":"Brazil","iso2":"BR","region":"Bahia","lat":-13.94,"lon":-42.26,"operator":"Indústrias Nucleares do Brasil (INB)","owners":[{"name":"INB (ENBPar)","pct":100}],"tickers":["INB (state)"],"method":"open-pit","status":"operating","production_tu":{"2019":0,"2020":0,"2021":29,"2022":43,"2023":91,"2024":85},"capacity_tu":340,"first_production_year":1999,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"state producer; unpublished","year":null},"permitting_stage":null,"note":"Brazil's only uranium mine; open pit with heap leach at the URA plant. Cachoeira pit was exhausted (heap-leach output ended 2016); the adjacent Engenho pit began mining in Dec 2020 and output has stayed far below the ~340 tU/yr (400 t concentrate) plant capaci","rg":"South America","own":{"South America":100}},{"id":"santa-quiteria","name":"Santa Quitéria (Itataia)","short":"Santa Quitéria (Itataia)","country":"Brazil","iso2":"BR","region":"Ceará","lat":-4.57,"lon":-39.72,"operator":"Consórcio Santa Quitéria (Galvani / INB)","owners":[{"name":"INB (mining rights; uranium)","pct":null},{"name":"Galvani (phosphate)","pct":null}],"tickers":["INB (state)","GALVANI (private)"],"method":"byproduct","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2031,"late":2037},"planned_output_tu":{"low":970,"base":1950,"high":null},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Still in preliminary environmental licensing (Licença Prévia) with IBAMA as of Feb 2026 - accepted for review March 2022; CNEN nuclear licensing to follow","note":"Phosphate-uranium co-product project: Galvani takes phosphate (1.05 Mt/yr fertiliser), INB the uranium. INB states 2,300 t/yr of uranium concentrate (~1,950 tU if U3O8); earlier plans were 970 tU/yr ramping to 1,270 tU/yr. Start dates have slipped repeatedly s","rg":"South America","own":{"South America":100}},{"id":"cigar-lake","name":"Cigar Lake","short":"Cigar Lake","country":"Canada","iso2":"CA","region":"Saskatchewan (Athabasca Basin)","lat":58.069,"lon":-104.541,"operator":"Cameco","owners":[{"name":"Cameco","pct":57.418},{"name":"Orano Canada","pct":42.582}],"tickers":["CCJ","ORANO (private, French state)"],"method":"underground","status":"operating","production_tu":{"2019":6925,"2020":3885,"2021":4693,"2022":6928,"2023":5808,"2024":6501,"2025":7347},"capacity_tu":6924,"first_production_year":2014,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2036,"cost_usd_lb":{"cash":17.19,"aisc":null,"basis":"Cameco estimated life-of-mine average unit cash operating cost C$23.94/lb (most recent AIF, cited in Q3-2026 MD&A) converted at 0.718 USD/CAD; excludes royalties and sustaining capital","year":2026},"permitting_stage":null,"note":"World's highest-grade mine: record 19.1 Mlb in 2025 (above the 18 Mlb licence by making up prior shortfalls); 2026 plan 17.5-18.0 Mlb (12.1 Mlb in 9M-2026). Reserve life ends 2036 unless Cigar Lake Extension (CLExt) is developed - work under way. In July 2026 ","guidance_tu":{"2026":{"low":6731,"high":6924}},"rg":"North America","own":{"North America":57.4,"Europe":42.6}},{"id":"mcarthur-river-key-lake","name":"McArthur River / Key Lake","short":"McArthur River / Key Lake","country":"Canada","iso2":"CA","region":"Saskatchewan (Athabasca Basin)","lat":57.761,"lon":-105.052,"operator":"Cameco","owners":[{"name":"Cameco","pct":69.805},{"name":"Orano Canada","pct":30.195}],"tickers":["CCJ","ORANO (private, French state)"],"method":"underground","status":"operating","production_tu":{"2019":0,"2020":0,"2021":0,"2022":423,"2023":5193,"2024":7808,"2025":5808},"capacity_tu":9616,"first_production_year":2000,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2044,"cost_usd_lb":{"cash":15.59,"aisc":null,"basis":"Cameco estimated life-of-mine average unit cash operating cost C$21.72/lb (most recent AIF, cited in Q3-2026 MD&A; to be revised with new NI 43-101 report) converted at 0.718 USD/CAD; excludes royalties and sustaining capital. Company-wide 2025 actual cash cost of production was C$23.74/lb","year":2026},"permitting_stage":null,"note":"Running well below the 25 Mlb licence: 20.3 Mlb in 2024, 15.1 Mlb in 2025 (development and ground-freezing delays in new zones), 2026 guidance cut and narrowed to 14.0-14.5 Mlb (9.9 Mlb in 9M-2026) with a long Key Lake mill outage in H2-2026. Updated NI 43-101","guidance_tu":{"2026":{"low":5385,"high":5577}},"rg":"North America","own":{"North America":69.8,"Europe":30.2}},{"id":"mcclean-lake","name":"McClean Lake (mill; McClean North SABRE mining)","short":"McClean Lake","country":"Canada","iso2":"CA","region":"Saskatchewan (Athabasca Basin)","lat":58.261,"lon":-103.802,"operator":"Orano Canada","owners":[{"name":"Orano Canada","pct":77.5},{"name":"Denison Mines","pct":22.5}],"tickers":["ORANO (private, French state)","DNN"],"method":"underground","status":"operating","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":249},"capacity_tu":null,"first_production_year":1999,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":26,"aisc":null,"basis":"Denison: 2025 average operating cash cost of McClean North finished goods ~C$36/lb (~US$26/lb)","year":2025},"permitting_stage":null,"note":"Own-ore production restarted mid-2025 at McClean North with SABRE (surface-access borehole jetting - classed here as 'underground'): 648,558 lb U3O8 (100%) in 2025. No 2026 guidance found in Denison/Orano releases. The mill (licensed 24 Mlb/yr, ~9,240 tU) main","rg":"North America","own":{"Europe":77.5,"North America":22.5}},{"id":"midwest","name":"Midwest (Main & A)","short":"Midwest (Main & A)","country":"Canada","iso2":"CA","region":"Saskatchewan (eastern Athabasca Basin)","lat":58.3,"lon":-104.08,"operator":"Orano Canada","owners":[{"name":"Orano Canada","pct":74.83},{"name":"Denison Mines","pct":25.17}],"tickers":["ORANO (private, French state)","DNN"],"method":"ISR","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2031,"late":2037},"planned_output_tu":{"low":1500,"base":2346,"high":2346},"ramp_years":1,"expected_end_year":null,"cost_usd_lb":{"cash":11.69,"aisc":25.78,"basis":"Denison Aug-2025 Midwest ISR PEA: LOM cash operating cost US$11.69/lb, all-in cost US$25.78/lb; initial capex C$254M","year":2025},"permitting_stage":"PEA (Aug 2025) for ISR mining of Midwest Main; open-pit concept had federal EA approval in 2012; no development decision by the operator (Orano)","note":"PEA: 37.4 Mlb over ~6 years (avg ~6.1 Mlb/yr) processed at McClean Lake 15 km away. Preliminary - Denison notes there is no assurance the JV will develop it by ISR. start_year_range and planned_output low are est. resources_tu = WNA indicated. coords approx.","rg":"North America","own":{"Europe":74.8,"North America":25.2}},{"id":"millennium","name":"Millennium","short":"Millennium","country":"Canada","iso2":"CA","region":"Saskatchewan (Athabasca Basin)","lat":57.51,"lon":-105.62,"operator":"Cameco","owners":[{"name":"Cameco","pct":69.9},{"name":"JCU (Canada) Exploration","pct":30.1}],"tickers":["CCJ"],"method":"underground","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2034,"late":2042},"planned_output_tu":{"low":2000,"base":2500,"high":2700},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Environmental assessment approved 2013; CNSC licence application withdrawn/paused in 2014; no work planned in 2026","note":"Shelved since 2014; Cameco: 'No work is planned at Millennium, Yeelirrie or Kintyre in 2026'. Ore would go to Key Lake. Indicated 75.9 Mlb + inferred 29.0 Mlb (100%). planned_output (~2,500 tU/yr per the original proposal, WNA) and start_year_range are est.; a","rg":"North America","own":{"North America":100}},{"id":"patterson-lake-south","name":"Patterson Lake South (Triple R)","short":"Patterson Lake South (Triple R)","country":"Canada","iso2":"CA","region":"Saskatchewan (SW Athabasca Basin)","lat":57.627,"lon":-109.367,"operator":"Paladin Energy (Paladin Canada, ex-Fission Uranium)","owners":[{"name":"Paladin Energy","pct":100}],"tickers":["PDN.AX","PDN.TO"],"method":"underground","status":"development","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":2031,"start_year_range":{"early":2031,"late":2034},"planned_output_tu":{"low":2700,"base":3462,"high":3462},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Saskatchewan EIS approved Feb 2026; CNSC construction-licence application (filed 2023) under review, CNSC administrative protocol targets completing hearings by end-2027; FID to follow; Mutual Benefits Agreement with Birch Narrows Dene Nation signed Q3 2026","note":"~9 Mlb/yr over a 10-year life from a 93.7 Mlb probable reserve (Aug-2025 engineering update). No FID yet; with CNSC hearings targeted for end-2027 and a ~3-year build, first production around 2031 is the earliest case (planned_start_year is est. from that sche","rg":"North America","own":{"Australia":100}},{"id":"rabbit-lake","name":"Rabbit Lake (Eagle Point)","short":"Rabbit Lake","country":"Canada","iso2":"CA","region":"Saskatchewan (Athabasca Basin)","lat":58.198,"lon":-103.714,"operator":"Cameco","owners":[{"name":"Cameco","pct":100}],"tickers":["CCJ"],"method":"underground","status":"care-maintenance","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":4231,"first_production_year":1975,"planned_start_year":null,"start_year_range":{"early":2030,"late":2037},"planned_output_tu":{"low":1150,"base":1540,"high":1620},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Licensed (CNSC licence to Oct 2038); in care and maintenance since 2016; no restart decision","note":"Idle since 2016; Cameco expects C$44-47M of care-and-maintenance cost in 2026 and has not signalled a restart. Indicated 38.6 Mlb + inferred 33.7 Mlb remain. start_year_range and planned_output are est. (historic output was ~4.2 Mlb/yr in 2013-15; a restart wo","guidance_tu":{"2026":{"low":0,"high":0}},"rg":"North America","own":{"North America":100}},{"id":"rook-i-arrow","name":"Rook I (Arrow)","short":"Rook I (Arrow)","country":"Canada","iso2":"CA","region":"Saskatchewan (SW Athabasca Basin)","lat":57.652,"lon":-109.283,"operator":"NexGen Energy","owners":[{"name":"NexGen Energy","pct":100}],"tickers":["NXE"],"method":"underground","status":"development","production_tu":{},"capacity_tu":11539,"first_production_year":null,"planned_start_year":2030,"start_year_range":{"early":2030,"late":2032},"planned_output_tu":{"low":8347,"base":11078,"high":11539},"ramp_years":2,"expected_end_year":2041,"cost_usd_lb":{"cash":9.98,"aisc":null,"basis":"NexGen Aug-2024 interim trend update to 2021 FS: LOM cash operating cost C$13.86/lb (US$9.98/lb); pre-production capex C$2.2bn, sustaining capital C$785M","year":2024},"permitting_stage":"Provincial EA Nov 2023; federal EA approved and CNSC Licence to Prepare Site and Construct issued 5 Mar 2026; licensed construction began 8 Jun 2026 (groundbreaking 13 Aug 2026); operating licence still required","note":"Largest new mine in the pipeline: permitted up to 30 Mlb/yr (FS ~28.8 Mlb/yr in years 1-5, 21.7 Mlb/yr LOM average over 10.7 years; probable reserves 239.6 Mlb). Four-year build from June 2026 implies first production ~mid-2030; shaft freezing/pre-sink starts ","rg":"North America","own":{"North America":100}},{"id":"tthe-heldeth-tue-waterbury","name":"Tthe Heldeth Tue (Waterbury Lake)","short":"Tthe Heldeth Tue","country":"Canada","iso2":"CA","region":"Saskatchewan (eastern Athabasca Basin)","lat":58.33,"lon":-104.05,"operator":"Denison Mines","owners":[{"name":"Denison Mines","pct":70.55},{"name":"Korea Waterbury Uranium LP (KHNP-led)","pct":29.45}],"tickers":["DNN","KHNP (state)"],"method":"ISR","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2033,"late":2040},"planned_output_tu":{"low":500,"base":620,"high":770},"ramp_years":1,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"PEA (2020) for ISR; ISR field test programme; no EA filed","note":"Small ISR satellite: 2020 PEA envisaged 3,730 tU over six years (~620 tU/yr) processed at McClean Lake. start_year_range and low/high output are est. coords approx.","rg":"North America","own":{"North America":70.6,"Other Asia and Middle East":29.5}},{"id":"wheeler-river-gryphon","name":"Wheeler River - Gryphon","short":"Wheeler River - Gryphon","country":"Canada","iso2":"CA","region":"Saskatchewan (eastern Athabasca Basin)","lat":57.53,"lon":-105.42,"operator":"Denison Mines","owners":[{"name":"Denison Mines","pct":90},{"name":"JCU (Canada) Exploration (50% Denison / 50% UEC)","pct":10}],"tickers":["DNN","UEC"],"method":"underground","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2033,"late":2040},"planned_output_tu":{"low":2300,"base":2900,"high":2900},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":{"cash":12.75,"aisc":25.47,"basis":"2023 Gryphon cost update to 2018 PFS: cash operating cost C$17.27/lb (US$12.75), all-in C$34.50/lb (US$25.47) - recalled from the June-2023 release, not re-verified in Nov 2026","year":2023},"permitting_stage":"PFS (2018, cost update 2023); covered by the Wheeler River EA; no development decision","note":"Conventional underground deposit 3 km from Phoenix; ore would be toll-milled at McClean Lake. Sequenced after Phoenix, funded from its cash flow, so no date is stated - start_year_range and planned_output (~7.6 Mlb/yr over ~6.5 years) are est. from the PFS upd","rg":"North America","own":{"North America":100}},{"id":"wheeler-river-phoenix","name":"Wheeler River - Phoenix (ISR)","short":"Wheeler River - Phoenix (ISR)","country":"Canada","iso2":"CA","region":"Saskatchewan (eastern Athabasca Basin)","lat":57.51,"lon":-105.38,"operator":"Denison Mines","owners":[{"name":"Denison Mines","pct":90},{"name":"JCU (Canada) Exploration (50% Denison / 50% UEC)","pct":10}],"tickers":["DNN","UEC"],"method":"ISR","status":"development","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":2028,"start_year_range":{"early":2028,"late":2029},"planned_output_tu":{"low":2180,"base":2345,"high":3300},"ramp_years":1,"expected_end_year":2038,"cost_usd_lb":{"cash":6.28,"aisc":16.04,"basis":"2023 Phoenix FS estimate: cash operating cost C$8.51/lb (US$6.28), all-in cost C$21.73/lb (US$16.04) - figures recalled from the June-2023 FS release, not re-verified in Nov 2026; initial capex since raised from C$419M to ~C$600M post-FID (Jan 2026)","year":2023},"permitting_stage":"Provincial EA July 2025; federal EA and CNSC construction licence Feb 2026; FID Feb 2026; full-scale construction from July 2026 (24% complete at 30 Sep 2026)","note":"First ISR mine in the Athabasca Basin and the next new Canadian producer: first production targeted H2 2028 (company earlier said mid-2028) after a ~24-month build. Denison's effective interest is 95%. planned_output base = WNA's 25,800 tU over an 11-year life","rg":"North America","own":{"North America":100}},{"id":"chongyi","name":"Chongyi (Lujing / Taoshan granite deposits)","short":"Chongyi","country":"China","iso2":"CN","region":"Jiangxi (Ganzhou, Chongyi County)","lat":25.68,"lon":114.31,"operator":"China National Uranium Corporation (CNNC)","owners":[{"name":"China National Nuclear Corporation (via China National Uranium Corporation)","pct":100}],"tickers":["CNNC (state)"],"method":"underground","status":"care-maintenance","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":1979,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"Underground mine with heap leaching (600 t ore/day), suspended since 2017 on cost grounds; no production in 2019-2025 (Red Book nominal capacity 0). Candidate for restart per Red Book 2026, no date announced. coords approx (county seat).","rg":"China","own":{"China":100}},{"id":"erenhot-bayanwula","name":"Erenhot / Erlian (Bayanwula ISL)","short":"Erenhot / Erlian","country":"China","iso2":"CN","region":"Inner Mongolia (Xilingol League, Erlian basin)","lat":43.9,"lon":113.3,"operator":"China National Uranium Corporation (CNNC)","owners":[{"name":"China National Nuclear Corporation (via China National Uranium Corporation)","pct":100}],"tickers":["CNNC (state)"],"method":"ISR","status":"operating","production_tu":{"2019":0,"2020":0,"2021":0,"2022":100,"2023":209,"2024":240,"2025":260},"capacity_tu":200,"first_production_year":2022,"planned_start_year":null,"start_year_range":null,"planned_output_tu":{"low":600,"base":1000,"high":null},"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"Country totals are China's own Red Book figures (2021: 1,540; 2022: 1,550; 2023: 1,728; 2024: 1,956; 2025 'expected': 2,160 tU); 2019-20 use the Red Book ~1,600 tU est. (WNA's table shows 1,885 for 2019-20 and only 1,600 for 2023-24 - I trust the government-re","rg":"China","own":{"China":100}},{"id":"fuzhou-xiangshan","name":"Fuzhou (Xiangshan volcanic deposits)","short":"Fuzhou","country":"China","iso2":"CN","region":"Jiangxi (Fuzhou, Le'an County)","lat":27.55,"lon":115.95,"operator":"China National Uranium Corporation (CNNC)","owners":[{"name":"China National Nuclear Corporation (via China National Uranium Corporation)","pct":100}],"tickers":["CNNC (state)"],"method":"underground","status":"care-maintenance","production_tu":{"2019":229,"2020":229,"2021":220,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":1966,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"Underground mine and conventional mill, on care and maintenance since 2022 because of high costs (Red Book nominal capacity now 0). 2021 = 220 tU is the Red Book 'volcanic-related' line (Fuzhou was the only volcanic-type centre still running); 2022-2025 are ze","rg":"China","own":{"China":100}},{"id":"ordos-national-uranium-no1","name":"National Uranium No. 1 (Ordos ISL demonstration project)","short":"National Uranium No. 1","country":"China","iso2":"CN","region":"Inner Mongolia (Ordos basin)","lat":39.9,"lon":109.6,"operator":"China National Uranium Corporation (CNNC)","owners":[{"name":"China National Nuclear Corporation (via China National Uranium Corporation)","pct":100}],"tickers":["CNNC (state)"],"method":"ISR","status":"ramp-up","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":50},"capacity_tu":null,"first_production_year":2025,"planned_start_year":null,"start_year_range":null,"planned_output_tu":{"low":null,"base":1000,"high":null},"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"Ground broken 12 Jul 2024, first drum of uranium 12 Jul 2025 (CO2+O2 ISL, remote-controlled wellfields). CNNC/CAEA call it the largest natural-uranium capacity project in China's history ('China's largest production capacity', i.e. above Yining's 920 tU/yr) bu","rg":"China","own":{"China":100}},{"id":"qinglong","name":"Qinglong (volcanic deposit)","short":"Qinglong","country":"China","iso2":"CN","region":"Hebei (Qinglong County)","lat":40.41,"lon":118.95,"operator":"China National Uranium Corporation (CNNC)","owners":[{"name":"China National Nuclear Corporation (via China National Uranium Corporation)","pct":100}],"tickers":["CNNC (state)"],"method":"underground","status":"care-maintenance","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":2007,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"Small underground mine (200 t ore/day, heap leach + solvent extraction), suspended since 2018 on cost grounds; no production in 2019-2025. The Red Book places it in Qinglong County, Hebei (WNA's table says Guizhou - treated as an error). Candidate for restart ","rg":"China","own":{"China":100}},{"id":"shaoguan","name":"Shaoguan (Xiazhuang / Zhuguang granite deposits)","short":"Shaoguan","country":"China","iso2":"CN","region":"Guangdong (Shaoguan)","lat":25.1,"lon":113.9,"operator":"China National Uranium Corporation (CNNC)","owners":[{"name":"China National Nuclear Corporation (via China National Uranium Corporation)","pct":100}],"tickers":["CNNC (state)"],"method":"underground","status":"operating","production_tu":{"2019":218,"2020":218,"2021":210,"2022":160,"2023":160,"2024":160,"2025":160},"capacity_tu":200,"first_production_year":1967,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"China's only operating hard-rock centre (underground, heap leach + small conventional circuit; nominal 200 tU/yr). 2021-2024 equal the Red Book 'granite-related' production line (210, 160, 160, 160 tU), which can only be Shaoguan since Chongyi has been suspend","rg":"China","own":{"China":100}},{"id":"tongliao-qianjiadian","name":"Tongliao (Qianjiadian ISL, Songliao basin)","short":"Tongliao","country":"China","iso2":"CN","region":"Inner Mongolia (Tongliao)","lat":43.78,"lon":122.6,"operator":"China National Uranium Corporation (CNNC) with CNPC","owners":[{"name":"China National Nuclear Corporation (CNNC)","pct":null},{"name":"China National Petroleum Corporation (CNPC)","pct":null}],"tickers":["CNNC (state)","CNPC (state)"],"method":"ISR","status":"operating","production_tu":{"2019":337,"2020":337,"2021":324,"2022":377,"2023":397,"2024":455,"2025":494},"capacity_tu":380,"first_production_year":2015,"planned_start_year":null,"start_year_range":null,"planned_output_tu":{"low":750,"base":1000,"high":null},"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"Country totals are China's own Red Book figures (2021: 1,540; 2022: 1,550; 2023: 1,728; 2024: 1,956; 2025 'expected': 2,160 tU); 2019-20 use the Red Book ~1,600 tU est. (WNA's table shows 1,885 for 2019-20 and only 1,600 for 2023-24 - I trust the government-re","rg":"China","own":{"China":100}},{"id":"yining-yili-isl","name":"Yining (Yili basin ISL complex; Kujieertai, Mengqiguer)","short":"Yining","country":"China","iso2":"CN","region":"Xinjiang (Yili Kazakh Autonomous Prefecture)","lat":43.72,"lon":81.05,"operator":"China National Uranium Corporation (CNNC)","owners":[{"name":"China National Nuclear Corporation (via China National Uranium Corporation)","pct":100}],"tickers":["CNNC (state)"],"method":"ISR","status":"operating","production_tu":{"2019":816,"2020":816,"2021":786,"2022":913,"2023":962,"2024":1101,"2025":1196},"capacity_tu":920,"first_production_year":1993,"planned_start_year":null,"start_year_range":null,"planned_output_tu":{"low":null,"base":1000,"high":null},"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"Country totals are China's own Red Book figures (2021: 1,540; 2022: 1,550; 2023: 1,728; 2024: 1,956; 2025 'expected': 2,160 tU); 2019-20 use the Red Book ~1,600 tU est. (WNA's table shows 1,885 for 2019-20 and only 1,600 for 2023-24 - I trust the government-re","rg":"China","own":{"China":100}},{"id":"terrafame-sotkamo","name":"Terrafame Sotkamo (uranium recovery plant)","short":"Terrafame Sotkamo","country":"Finland","iso2":"FI","region":"Kainuu (Sotkamo)","lat":63.975,"lon":28.008,"operator":"Terrafame","owners":[{"name":"Finnish Minerals Group (state)","pct":null},{"name":"Trafigura / Galena funds","pct":null}],"tickers":["FINNISH MINERALS GROUP (state)","TRAFIGURA (private)"],"method":"byproduct","status":"ramp-up","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0},"capacity_tu":200,"first_production_year":2024,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"by-product of Ni-Zn bioheap leaching; unpublished","year":null},"permitting_stage":null,"note":"Europe's only uranium producer: solvent-extraction plant (built by Talvivaara with Cameco funding, ~98% complete when Talvivaara went bankrupt in 2014) was commissioned in June 2024 to strip ~17 mg/kg uranium from nickel-zinc leach solution. Designed for ~200 ","rg":"Europe","own":{"Europe":100}},{"id":"kvanefjeld","name":"Kvanefjeld (Kuannersuit)","short":"Kvanefjeld","country":"Greenland","iso2":"GL","region":"Kujalleq (Narsaq)","lat":60.983,"lon":-46,"operator":"Energy Transition Minerals","owners":[{"name":"Energy Transition Minerals","pct":100}],"tickers":["ASX:ETM"],"method":"byproduct","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2036,"late":2045},"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Blocked: Greenland's Uranium Act (No. 20 of 2021) prohibits uranium exploration and mining; exploitation licence not granted; exploration licence renewal refused June 2026; litigation in the High Court of Greenland","note":"Rare-earth project with by-product uranium (ore ~360 ppm U3O8; 32,800 tU in reserves). The arbitral tribunal ruled in Oct 2025 that Denmark was not a party and that the licence claim belonged in the courts; ETM's case is now before the High Court of Greenland ","rg":"Europe","own":{"Europe":100}},{"id":"rohil","name":"Rohil","short":"Rohil","country":"India","iso2":"IN","region":"Rajasthan (Sikar district)","lat":27.6,"lon":75.47,"operator":"Uranium Corporation of India Ltd (UCIL)","owners":[{"name":"Uranium Corporation of India Ltd (Government of India, Department of Atomic Energy)","pct":100}],"tickers":["UCIL (state)"],"method":"underground","status":"proposed","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":null,"planned_start_year":2030,"start_year_range":{"early":2031,"late":2036},"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":"Pre-project activities; exploratory mining decline 575 m long / 82 m deep completed (Phase V), Phase VI to reach the ore body for a bulk sample; no reported mining lease or construction sanction","note":"UCIL told the Red Book it plans a mine and processing plant at Rohil by 2030; design output is not published. Given UCIL's record (Gogi, Lambapur-Peddagattu and KPM/Domiasiat have been stalled for 10-20 years by state-level and local opposition and are omitted","rg":"Other Asia and Middle East","own":{"Other Asia and Middle East":100}},{"id":"singhbhum-jaduguda-turamdih","name":"Singhbhum complex (Jaduguda and Turamdih mills; seven mines)","short":"Singhbhum complex","country":"India","iso2":"IN","region":"Jharkhand (East Singhbhum / Seraikela-Kharsawan)","lat":22.653,"lon":86.347,"operator":"Uranium Corporation of India Ltd (UCIL)","owners":[{"name":"Uranium Corporation of India Ltd (Government of India, Department of Atomic Energy)","pct":100}],"tickers":["UCIL (state)"],"method":"underground","status":"operating","production_tu":{"2019":197,"2020":256,"2021":288,"2022":312,"2023":310,"2024":310,"2025":310},"capacity_tu":390,"first_production_year":1967,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"India does not publish uranium output. National totals used: 2019 = 308 and 2020 = 400 (WNA est.; Red Book has 540 for 2020), 2021 = 450, 2022 = 488, 2023 = 485 (figures India gave the Red Book), 2024-25 = 485 (Red Book Secretariat est.; WNA shows 600/600/485/","rg":"Other Asia and Middle East","own":{"Other Asia and Middle East":100}},{"id":"tummalapalle","name":"Tummalapalle","short":"Tummalapalle","country":"India","iso2":"IN","region":"Andhra Pradesh (YSR Kadapa district)","lat":14.32,"lon":78.26,"operator":"Uranium Corporation of India Ltd (UCIL)","owners":[{"name":"Uranium Corporation of India Ltd (Government of India, Department of Atomic Energy)","pct":100}],"tickers":["UCIL (state)"],"method":"underground","status":"operating","production_tu":{"2019":111,"2020":144,"2021":162,"2022":176,"2023":175,"2024":175,"2025":175},"capacity_tu":220,"first_production_year":2012,"planned_start_year":null,"start_year_range":null,"planned_output_tu":{"low":220,"base":330,"high":330},"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"India does not publish uranium output. National totals used: 2019 = 308 and 2020 = 400 (WNA est.; Red Book has 540 for 2020), 2021 = 450, 2022 = 488, 2023 = 485 (figures India gave the Red Book), 2024-25 = 485 (Red Book Secretariat est.; WNA shows 600/600/485/","rg":"Other Asia and Middle East","own":{"Other Asia and Middle East":100}},{"id":"gchine","name":"Gchine (Gachin) mine and Bandar Abbas uranium plant","short":"Gchine (Gachin) mine and Bandar Abbas uranium plant","country":"Iran","iso2":"IR","region":"Hormozgan province (Bandar Abbas)","lat":27.1,"lon":55.94,"operator":"Atomic Energy Organization of Iran (AEOI)","owners":[{"name":"Atomic Energy Organization of Iran (state)","pct":100}],"tickers":["AEOI (state)"],"method":"open-pit","status":"closed","production_tu":{},"capacity_tu":21,"first_production_year":2006,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2016,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"Tiny salt-plug deposit (84 tU at 0.068% U) with a 21 tU/yr plant. Sources conflict: the Red Book (and IAEA information cited by WNN) say the Bandar Abbas plant closed in 2016, while WNA's country page says operations continue at about 21 tU/yr. I follow the Re","rg":"Other Asia and Middle East","own":{"Other Asia and Middle East":100}},{"id":"narigan","name":"Narigan uranium-molybdenum project","short":"Narigan uranium-molybdenum project","country":"Iran","iso2":"IR","region":"Yazd province (Bafq area)","lat":31.85,"lon":55.67,"operator":"Atomic Energy Organization of Iran (AEOI)","owners":[{"name":"Atomic Energy Organization of Iran (state)","pct":100}],"tickers":["AEOI (state)"],"method":"open-pit","status":"development","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2026,"late":2030},"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":"AEOI inaugurated work at the Narigan Mining and Industrial Complex on 5 Feb 2023; Red Book 2024 says feasibility studies for a Narigan production centre were still under way","note":"AEOI calls it Iran's largest uranium-molybdenum mine (650 tU plus 4,600 t Mo in 'definitive and probable reserves'); ore is to be sent to Isfahan. No design output, mining method or commissioning date is published (open-pit is my est.; start range is my est., ","rg":"Other Asia and Middle East","own":{"Other Asia and Middle East":100}},{"id":"saghand-ardakan","name":"Saghand mine and Ardakan yellowcake plant","short":"Saghand mine and Ardakan yellowcake plant","country":"Iran","iso2":"IR","region":"Yazd province","lat":32.313,"lon":55.53,"operator":"Atomic Energy Organization of Iran (AEOI)","owners":[{"name":"Atomic Energy Organization of Iran (state)","pct":100}],"tickers":["AEOI (state)"],"method":"underground","status":"operating","production_tu":{"2019":21,"2020":21,"2021":21,"2022":21,"2023":21,"2024":21,"2025":21},"capacity_tu":50,"first_production_year":2017,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"All figures are est.: Iran has not reported since the 2020 Red Book, and the NEA/IAEA Secretariat carries a flat 21 tU/yr for the whole country (about 4 tU open pit + 17 tU underground), which I assign entirely to Saghand/Ardakan, the only centre it lists as o","rg":"Other Asia and Middle East","own":{"Other Asia and Middle East":100}},{"id":"akbastau-budenovskoye-1-3-4","name":"Akbastau (Budenovskoye blocks 1, 3, 4)","short":"Akbastau","country":"Kazakhstan","iso2":"KZ","region":"Turkestan region (Sozak district), Chu-Sarysu basin","lat":44.71,"lon":67.58,"operator":"JV Akbastau JSC","owners":[{"name":"Kazatomprom","pct":50},{"name":"Uranium One (Rosatom)","pct":50}],"tickers":["KAP (LSE/AIX)","ROSATOM (state)"],"method":"ISR","status":"operating","production_tu":{"2019":1550,"2020":1363,"2021":1545,"2022":1545,"2023":1647,"2024":2001,"2025":2227},"capacity_tu":3000,"first_production_year":2009,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2038,"cost_usd_lb":{"cash":26.25,"aisc":39.75,"basis":"Kazatomprom group guidance for 2026, midpoint (C1 $25.50 to $27.00, all-in sustaining $39.00 to $40.50); not mine-specific","year":2026,"prior":{"year":2025,"cash":18.06,"aisc":29.53}},"permitting_stage":null,"note":"2025 output 2,227 tU (+11%). Contracts of Nov 2007 run 30-31 years (block 1 to 2037; blocks 3-4 to 2038). capacity_tu is WNA's dated nominal design target (1,000 + 2,000 tU/yr). coords from Wikipedia (low precision). Kazatomprom gives 2026 guidance only at gro","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"appak-west-mynkuduk","name":"Appak (West Mynkuduk)","short":"Appak","country":"Kazakhstan","iso2":"KZ","region":"Turkestan region (Sozak district), Chu-Sarysu basin","lat":45.6,"lon":68.75,"operator":"APPAK LLP","owners":[{"name":"Kazatomprom","pct":65},{"name":"Sumitomo Corp","pct":25},{"name":"Kansai Electric Power","pct":10}],"tickers":["KAP (LSE/AIX)","8053.T","9503.T"],"method":"ISR","status":"operating","production_tu":{"2019":800,"2020":633,"2021":805,"2022":803,"2023":832,"2024":833,"2025":805},"capacity_tu":1000,"first_production_year":2008,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2035,"cost_usd_lb":{"cash":26.25,"aisc":39.75,"basis":"Kazatomprom group guidance for 2026, midpoint (C1 $25.50 to $27.00, all-in sustaining $39.00 to $40.50); not mine-specific","year":2026,"prior":{"year":2025,"cash":18.06,"aisc":29.53}},"permitting_stage":null,"note":"Flat ~800-830 tU/yr. Contract July 2005, 30 years (to 2035). capacity_tu is WNA's dated design target. coords approx (+/-40 km). Kazatomprom gives 2026 guidance only at group level: 27,500-29,000 tU (100% basis), subject to sulphuric acid; 9M-2026 group output","rg":"Russia and Central Asia","own":{"Russia and Central Asia":65,"Other Asia and Middle East":35}},{"id":"baiken-u-kharasan-2","name":"Baiken-U (North Kharasan block 2)","short":"Baiken-U","country":"Kazakhstan","iso2":"KZ","region":"Kyzylorda region (Zhanakorgan district), Syrdarya basin","lat":43.9,"lon":66.95,"operator":"Baiken-U LLP","owners":[{"name":"Kazatomprom","pct":52.5},{"name":"Energy Asia (Japanese consortium: Marubeni, TEPCO, Toshiba, Chubu, Tohoku, Kyushu)","pct":47.5}],"tickers":["KAP (LSE/AIX)"],"method":"ISR","status":"operating","production_tu":{"2019":1560,"2020":1181,"2021":1230,"2022":1315,"2023":1066,"2024":1141,"2025":1203},"capacity_tu":2000,"first_production_year":2010,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2055,"cost_usd_lb":{"cash":26.25,"aisc":39.75,"basis":"Kazatomprom group guidance for 2026, midpoint (C1 $25.50 to $27.00, all-in sustaining $39.00 to $40.50); not mine-specific","year":2026,"prior":{"year":2025,"cash":18.06,"aisc":29.53}},"permitting_stage":null,"note":"1,203 tU in 2025 (+5%), well below the 2,000 tU/yr design level; deepest ISR deposit in Kazakhstan. Contract March 2006, 49 years. Kazatomprom's 52.5% is 5% direct plus its 50% of Energy Asia (BVI), which holds 95%. capacity_tu is WNA's dated design target. co","rg":"Russia and Central Asia","own":{"Russia and Central Asia":52.5,"Other Asia and Middle East":47.5}},{"id":"budenovskoye-6-7","name":"JV Budenovskoye (blocks 6 & 7)","short":"JV Budenovskoye","country":"Kazakhstan","iso2":"KZ","region":"Turkestan region (Sozak district), Chu-Sarysu basin","lat":44.6,"lon":67.45,"operator":"JV Budenovskoye LLP","owners":[{"name":"Kazatomprom","pct":51},{"name":"Uranium One (Rosatom)","pct":49}],"tickers":["KAP (LSE/AIX)","ROSATOM (state)"],"method":"ISR","status":"ramp-up","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":180,"2024":617,"2025":1210},"capacity_tu":6000,"first_production_year":2023,"planned_start_year":null,"start_year_range":null,"planned_output_tu":{"low":4000,"base":6000,"high":6000},"ramp_years":5,"expected_end_year":2045,"cost_usd_lb":{"cash":26.25,"aisc":39.75,"basis":"Kazatomprom group guidance for 2026, midpoint (C1 $25.50 to $27.00, all-in sustaining $39.00 to $40.50); not mine-specific","year":2026,"prior":{"year":2025,"cash":18.06,"aisc":29.53}},"permitting_stage":null,"note":"The single biggest volume swing in Kazakhstan: 6,000 tU/yr processing complex under construction (phase-1 start-up complex operating; phase 2 'in definition'), output 180 -> 617 -> 1,210 tU in 2023-25. Kazatomprom says the 2026 group increase is 'primarily dri","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"inkai","name":"Inkai (JV Inkai, blocks 1-2)","short":"Inkai","country":"Kazakhstan","iso2":"KZ","region":"Turkestan region (Sozak district), Chu-Sarysu basin","lat":45.282,"lon":67.537,"operator":"JV Inkai LLP","owners":[{"name":"Kazatomprom","pct":60},{"name":"Cameco","pct":40}],"tickers":["KAP (LSE/AIX)","CCJ"],"method":"ISR","status":"operating","production_tu":{"2019":3209,"2020":2693,"2021":3449,"2022":3201,"2023":3230,"2024":2992,"2025":3215},"capacity_tu":4000,"first_production_year":2009,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2045,"cost_usd_lb":{"cash":26.25,"aisc":39.75,"basis":"Kazatomprom group guidance for 2026, midpoint (C1 $25.50 to $27.00, all-in sustaining $39.00 to $40.50); not mine-specific","year":2026,"prior":{"year":2025,"cash":18.06,"aisc":29.53}},"permitting_stage":null,"note":"2026 target 10.4 Mlb (4,000 tU, 100% basis) = licensed wellfield capacity; 8.1 Mlb produced in 9M-2026 vs 5.9 Mlb in 9M-2025; process-plant expansion due for completion 2026. Licence to July 2045. Cameco's purchase share of 2026 output is 4.2 Mlb. Acid supply ","guidance_tu":{"2026":{"low":4000,"high":4000}},"rg":"Russia and Central Asia","own":{"Russia and Central Asia":60,"North America":40}},{"id":"inkai-3","name":"Inkai block 3 (Kazatomprom-SaUran)","short":"Inkai block 3","country":"Kazakhstan","iso2":"KZ","region":"Turkestan region (Sozak district), Chu-Sarysu basin","lat":45.4,"lon":67.75,"operator":"Kazatomprom-SaUran LLP","owners":[{"name":"Kazatomprom","pct":100}],"tickers":["KAP (LSE/AIX)"],"method":"ISR","status":"development","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2027,"late":2031},"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Pilot-production subsoil-use contract signed 5 June 2024 (4 years); 2025-2030 development project in Kazatomprom's investment programme; full production contract still to come","note":"New 100%-Kazatomprom deposit next to JV Inkai. At end-2025 output was more than 20% below the contract schedule because of lagging surface infrastructure and material supply delays; 2026 capex includes Inkai-3 infrastructure. Design output is not published in ","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"karatau-budenovskoye-2","name":"Karatau (Budenovskoye block 2)","short":"Karatau","country":"Kazakhstan","iso2":"KZ","region":"Turkestan region (Sozak district), Chu-Sarysu basin","lat":44.8,"lon":67.75,"operator":"Karatau LLP","owners":[{"name":"Kazatomprom","pct":50},{"name":"Uranium One (Rosatom)","pct":50}],"tickers":["KAP (LSE/AIX)","ROSATOM (state)"],"method":"ISR","status":"operating","production_tu":{"2019":2600,"2020":2460,"2021":2561,"2022":2560,"2023":2611,"2024":3299,"2025":3622},"capacity_tu":null,"first_production_year":2008,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2040,"cost_usd_lb":{"cash":26.25,"aisc":39.75,"basis":"Kazatomprom group guidance for 2026, midpoint (C1 $25.50 to $27.00, all-in sustaining $39.00 to $40.50); not mine-specific","year":2026,"prior":{"year":2025,"cash":18.06,"aisc":29.53}},"permitting_stage":null,"note":"Largest single Kazakh producer in 2025 (3,622 tU, +10%). Subsoil-use contract of July 2005 runs 35 years (to 2040). Asset-level capacity/contract level not published (WNA's dated design figure is 2,000-3,000 tU/yr). coords approx (Budenovskoye deposit, +/-25 k","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"katco-moinkum-tortkuduk","name":"KATCO (Moinkum / Tortkuduk / South Tortkuduk)","short":"KATCO","country":"Kazakhstan","iso2":"KZ","region":"Turkestan region (Sozak district), Chu-Sarysu basin","lat":44.85,"lon":68.8,"operator":"JV KATCO LLP","owners":[{"name":"Orano","pct":51},{"name":"Kazatomprom","pct":49}],"tickers":["ORANO (private, French state)","KAP (LSE/AIX)"],"method":"ISR","status":"operating","production_tu":{"2019":3252,"2020":2833,"2021":2840,"2022":2564,"2023":2103,"2024":2388,"2025":3714},"capacity_tu":4000,"first_production_year":2006,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2039,"cost_usd_lb":{"cash":26.25,"aisc":39.75,"basis":"Kazatomprom group guidance for 2026, midpoint (C1 $25.50 to $27.00, all-in sustaining $39.00 to $40.50); not mine-specific","year":2026,"prior":{"year":2025,"cash":18.06,"aisc":29.53}},"permitting_stage":null,"note":"Rebounded to 3,714 tU in 2025 (+56%) as South Tortkuduk came on line (first output June 2024; new processing plant fully operational July 2025). Project objective is to hold output at up to 4,000 tU/yr. Contract of March 2000 runs 39 years (to 2039). coords ap","rg":"Russia and Central Asia","own":{"Europe":51,"Russia and Central Asia":49}},{"id":"ortalyk-central-mynkuduk","name":"Ortalyk (Central Mynkuduk)","short":"Ortalyk","country":"Kazakhstan","iso2":"KZ","region":"Turkestan region (Sozak district), Chu-Sarysu basin","lat":45.55,"lon":69,"operator":"MC Ortalyk LLP","owners":[{"name":"Kazatomprom","pct":51},{"name":"CGN Mining","pct":49}],"tickers":["KAP (LSE/AIX)","1164.HK"],"method":"ISR","status":"operating","production_tu":{"2019":1694,"2020":1308,"2021":1579,"2022":1650,"2023":1648,"2024":1739,"2025":1789},"capacity_tu":2000,"first_production_year":2007,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2033,"cost_usd_lb":{"cash":26.25,"aisc":39.75,"basis":"Kazatomprom group guidance for 2026, midpoint (C1 $25.50 to $27.00, all-in sustaining $39.00 to $40.50); not mine-specific","year":2026,"prior":{"year":2025,"cash":18.06,"aisc":29.53}},"permitting_stage":null,"note":"Entity total (includes any early Zhalpak output; see separate 'zhalpak' record for the 900 tU/yr expansion - do not double count). 1,789 tU in 2025. Central Mynkuduk contract July 2005, 28 years (to 2033). CGN Mining takes 49% of output. coords approx (+/-40 k","rg":"Russia and Central Asia","own":{"Russia and Central Asia":51,"China":49}},{"id":"ru-6-karamurun","name":"RU-6 (North & South Karamurun)","short":"RU-6","country":"Kazakhstan","iso2":"KZ","region":"Kyzylorda region (Shieli district), Syrdarya basin","lat":44.3,"lon":66.8,"operator":"RU-6 LLP","owners":[{"name":"Kazatomprom","pct":100}],"tickers":["KAP (LSE/AIX)"],"method":"ISR","status":"operating","production_tu":{"2019":864,"2020":660,"2021":800,"2022":830,"2023":833,"2024":833,"2025":833},"capacity_tu":1250,"first_production_year":null,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2040,"cost_usd_lb":{"cash":26.25,"aisc":39.75,"basis":"Kazatomprom group guidance for 2026, midpoint (C1 $25.50 to $27.00, all-in sustaining $39.00 to $40.50); not mine-specific","year":2026,"prior":{"year":2025,"cash":18.06,"aisc":29.53}},"permitting_stage":null,"note":"Steady 833 tU/yr for three years. Contract Nov 1996, 44 years (to 2040). capacity_tu is WNA's dated design target (1,000 + 250). coords approx (+/-40 km). Kazatomprom gives 2026 guidance only at group level: 27,500-29,000 tU (100% basis), subject to sulphuric ","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"sauran","name":"Kazatomprom-SaUran (Kanzhugan, Central Moinkum, East Mynkuduk)","short":"Kazatomprom-SaUran","country":"Kazakhstan","iso2":"KZ","region":"Turkestan region (Sozak district), Chu-Sarysu basin","lat":43.9,"lon":69.75,"operator":"Kazatomprom-SaUran LLP","owners":[{"name":"Kazatomprom","pct":100}],"tickers":["KAP (LSE/AIX)"],"method":"ISR","status":"operating","production_tu":{"2019":1541,"2020":1230,"2021":1493,"2022":1273,"2023":1070,"2024":1020,"2025":821},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2047,"cost_usd_lb":{"cash":26.25,"aisc":39.75,"basis":"Kazatomprom group guidance for 2026, midpoint (C1 $25.50 to $27.00, all-in sustaining $39.00 to $40.50); not mine-specific","year":2026,"prior":{"year":2025,"cash":18.06,"aisc":29.53}},"permitting_stage":null,"note":"Mature, declining group of 100%-owned mines: 821 tU in 2025 (-20%). Uvanas and South Moinkum (south part) are in liquidation; East Mynkuduk contract ends 2027; Kanzhugan runs to 2047, Central Moinkum to 2041. SaUran also holds the new Inkai block 3 contract (s","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"semizbay-u-irkol-semizbay","name":"Semizbay-U (Irkol & Semizbay)","short":"Semizbay-U","country":"Kazakhstan","iso2":"KZ","region":"Kyzylorda region (Shieli district) and Akmola region","lat":44.1,"lon":66.55,"operator":"Semizbay-U LLP","owners":[{"name":"Kazatomprom","pct":51},{"name":"CGN Mining","pct":49}],"tickers":["KAP (LSE/AIX)","1164.HK"],"method":"ISR","status":"operating","production_tu":{"2019":960,"2020":753,"2021":962,"2022":940,"2023":963,"2024":963,"2025":855},"capacity_tu":1450,"first_production_year":2008,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2031,"cost_usd_lb":{"cash":26.25,"aisc":39.75,"basis":"Kazatomprom group guidance for 2026, midpoint (C1 $25.50 to $27.00, all-in sustaining $39.00 to $40.50); not mine-specific","year":2026,"prior":{"year":2025,"cash":18.06,"aisc":29.53}},"permitting_stage":null,"note":"Two small mines ~1,000 km apart reported as one entity: Irkol (Kyzylorda; contract July 2005, 25 yrs -> 2030) and Semizbay (Akmola, ~53N 72E; contract June 2006, 25 yrs -> 2031). 855 tU in 2025 (-11%). Both contracts expire around 2030-31. capacity_tu is WNA's","rg":"Russia and Central Asia","own":{"Russia and Central Asia":51,"China":49}},{"id":"smcc-south-inkai-akdala","name":"SMCC (South Inkai block 4 & Akdala)","short":"SMCC","country":"Kazakhstan","iso2":"KZ","region":"Turkestan region (Sozak district), Chu-Sarysu basin","lat":45.168,"lon":67.495,"operator":"JV South Mining Chemical Company LLP (SMCC)","owners":[{"name":"Uranium One (Rosatom)","pct":70},{"name":"Kazatomprom","pct":30}],"tickers":["ROSATOM (state)","KAP (LSE/AIX)"],"method":"ISR","status":"operating","production_tu":{"2019":2401,"2020":2260,"2021":2321,"2022":2225,"2023":2488,"2024":2803,"2025":2845},"capacity_tu":3000,"first_production_year":2006,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2029,"cost_usd_lb":{"cash":26.25,"aisc":39.75,"basis":"Kazatomprom group guidance for 2026, midpoint (C1 $25.50 to $27.00, all-in sustaining $39.00 to $40.50); not mine-specific","year":2026,"prior":{"year":2025,"cash":18.06,"aisc":29.53}},"permitting_stage":null,"note":"Watch contract expiry: the Akdala contract (March 2001, 25 yrs) expired in 2026 and on 28 Jan 2026 the state decided to terminate it at expiry and place the Akdala area under Kazatomprom trust management pending a new contract; the South Inkai (Inkai block 4) ","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"turanium-kharasan-1","name":"Turanium (ex Khorasan-U; North Kharasan block 1)","short":"Turanium","country":"Kazakhstan","iso2":"KZ","region":"Kyzylorda region (Zhanakorgan district), Syrdarya basin","lat":43.84,"lon":66.86,"operator":"Turanium LLP","owners":[{"name":"Kazatomprom","pct":50},{"name":"China Uranium Development (CGN)","pct":30},{"name":"Energy Asia Holdings (Japanese consortium)","pct":20}],"tickers":["KAP (LSE/AIX)","1164.HK (CGN Mining) / CGN (state)"],"method":"ISR","status":"operating","production_tu":{"2019":1599,"2020":1455,"2021":1579,"2022":1580,"2023":1681,"2024":2030,"2025":2154},"capacity_tu":3000,"first_production_year":2010,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2058,"cost_usd_lb":{"cash":26.25,"aisc":39.75,"basis":"Kazatomprom group guidance for 2026, midpoint (C1 $25.50 to $27.00, all-in sustaining $39.00 to $40.50); not mine-specific","year":2026,"prior":{"year":2025,"cash":18.06,"aisc":29.53}},"permitting_stage":null,"note":"2,154 tU in 2025 (+6%). Uranium One sold its 30% to CGN's China Uranium Development in 2024-25, shifting offtake from Russia to China. Contract May 2005, 53 years. capacity_tu is WNA's dated design target. coords from Wikipedia 'Kharasan mine' (low precision).","rg":"Russia and Central Asia","own":{"Russia and Central Asia":50,"China":30,"Other Asia and Middle East":20}},{"id":"zarechnoye","name":"Zarechnoye","short":"Zarechnoye","country":"Kazakhstan","iso2":"KZ","region":"Turkestan region (Otyrar district), Syrdarya basin","lat":42.28,"lon":68.01,"operator":"JV Zarechnoye JSC","owners":[{"name":"Kazatomprom","pct":49.98},{"name":"SNURDC Astana Mining (SPIC, China)","pct":49.98},{"name":"Karabalta Mining Combine","pct":0.04}],"tickers":["KAP (LSE/AIX)","SPIC / SNURDC (state)"],"method":"ISR","status":"operating","production_tu":{"2019":778,"2020":648,"2021":655,"2022":741,"2023":757,"2024":611,"2025":546},"capacity_tu":1000,"first_production_year":2007,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2028,"cost_usd_lb":{"cash":26.25,"aisc":39.75,"basis":"Kazatomprom group guidance for 2026, midpoint (C1 $25.50 to $27.00, all-in sustaining $39.00 to $40.50); not mine-specific","year":2026,"prior":{"year":2025,"cash":18.06,"aisc":29.53}},"permitting_stage":null,"note":"Depleting: 546 tU in 2025 (-11%); contract of Sept 2002 runs 26 years (to 2028) and remaining reserves are only a few thousand tU. Uranium One sold its 49.98% to China's SNURDC in Dec 2024. coords from Wikipedia (low precision). Kazatomprom gives 2026 guidance","rg":"Russia and Central Asia","own":{"Russia and Central Asia":50,"China":50}},{"id":"zhalpak","name":"Zhalpak (Ortalyk expansion)","short":"Zhalpak","country":"Kazakhstan","iso2":"KZ","region":"Turkestan region (Sozak district), Chu-Sarysu basin","lat":45.4,"lon":69.3,"operator":"MC Ortalyk LLP","owners":[{"name":"Kazatomprom","pct":51},{"name":"CGN Mining","pct":49}],"tickers":["KAP (LSE/AIX)","1164.HK"],"method":"ISR","status":"ramp-up","production_tu":{},"capacity_tu":900,"first_production_year":2026,"planned_start_year":2026,"start_year_range":{"early":2026,"late":2027},"planned_output_tu":{"low":500,"base":900,"high":900},"ramp_years":2,"expected_end_year":2046,"cost_usd_lb":null,"permitting_stage":"Subsoil-use production contract signed Dec 2021 (25 years); first 500 t/yr processing stage commissioned July 2026","note":"Processing plant with capacity up to 500 tU/yr commissioned July 2026; designed for 900 tU/yr (project timeline 2022-2027). Output is reported INSIDE MC Ortalyk's entity total - treat planned_output as incremental to 'ortalyk-central-mynkuduk'. resources_tu is","rg":"Russia and Central Asia","own":{"Russia and Central Asia":51,"China":49}},{"id":"kara-balta-mill","name":"Kara-Balta hydrometallurgical plant (Kara Balta Mining Combine)","short":"Kara-Balta hydrometallurgical plant","country":"Kyrgyzstan","iso2":"KG","region":"Chuy region (Kara-Balta)","lat":42.81,"lon":73.86,"operator":"Kyrgyzaltyn OJSC (Karabalta Mining Company)","owners":[{"name":"Kyrgyzaltyn OJSC (state-owned)","pct":null}],"tickers":["KYRGYZALTYN (state)"],"method":"ISR","status":"care-maintenance","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":1951,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"Mill only, no mine: it toll-processed Kazakh ISL product (peak 2,574 tU in 2009), stopped in Nov 2015 for lack of feed and formally closed in 2016 - zero output in 2019-2025 (method 'ISR' reflects its last feed source). The 2019 uranium ban also barred uranium","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"kyzyl-ompol","name":"Kyzyl-Ompol (Tash-Bulak / Kok-Moinok)","short":"Kyzyl-Ompol","country":"Kyrgyzstan","iso2":"KG","region":"Issyk-Kul / Naryn regions (about 125 km east of Bishkek)","lat":42.47,"lon":75.95,"operator":"Kyrgyzaltyn OJSC","owners":[{"name":"Kyrgyzaltyn OJSC (state-owned)","pct":null}],"tickers":["KYRGYZALTYN (state)"],"method":"byproduct","status":"proposed","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2028,"late":2034},"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":"Uranium/thorium mining ban repealed June 2024; Kyrgyzaltyn holds the licence for the Tash-Bulak site (by Aug 2024); no published feasibility study, design output or start date","note":"Titanomagnetite placer and hydrothermal deposits with uranium and thorium; uranium would be a co-/by-product. Only 2,900 tU inferred at Kok-Moinok is code-compliant (NI 43-101, 2014); historic licence-wide estimates are 16,200-19,700 tU. Previous owner Azarga/","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"kayelekera","name":"Kayelekera","short":"Kayelekera","country":"Malawi","iso2":"MW","region":"Karonga District (Northern Region)","lat":-9.993,"lon":33.698,"operator":"Lotus Resources (Lotus Africa)","owners":[{"name":"Lotus Resources","pct":85},{"name":"Government of Malawi","pct":15}],"tickers":["LOT"],"method":"open-pit","status":"ramp-up","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":38},"capacity_tu":923,"first_production_year":2009,"planned_start_year":null,"start_year_range":null,"planned_output_tu":{"low":769,"base":923,"high":923},"ramp_years":2,"expected_end_year":2035,"cost_usd_lb":{"cash":34.5,"aisc":44.8,"basis":"Accelerated Restart Plan (Oct 2024) steady-state estimate at US$90/lb; actual ramp-up unit costs are far higher and not yet reported on a steady-state basis","year":2024},"permitting_stage":null,"note":"Restarted Aug-Sep 2025 after 2014-25 care & maintenance, but ramp-up is well behind plan. Actuals: Jul-Dec 2025 98.0 klb U3O8 (38 tU); Jan-Jun 2026 234.1 klb (90 tU; FY2026 332.1 klb at only 47% recovery); Sep-2026 quarter ~101.8 klb (39 tU) in ~31 operating d","rg":"Africa","own":{"Australia":85,"Africa":15}},{"id":"tiris","name":"Tiris","short":"Tiris","country":"Mauritania","iso2":"MR","region":"Tiris Zemmour (Reguibat Craton)","lat":23.7,"lon":-7.9,"operator":"Aura Energy","owners":[{"name":"Aura Energy","pct":85},{"name":"Government of Mauritania","pct":15}],"tickers":["AEE"],"method":"open-pit","status":"development","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":2028,"start_year_range":{"early":2029,"late":2031},"planned_output_tu":{"low":692,"base":692,"high":885},"ramp_years":2,"expected_end_year":2054,"cost_usd_lb":{"cash":32.53,"aisc":41.25,"basis":"Bankable Feasibility Study, Oct 2026 (life-of-mine, +/-15% capex)","year":2026},"permitting_stage":"Exploitation permit, environmental approvals and 30-year mining convention in place (final permit July 2024). BFS released Oct 2026; FID targeted Dec 2026; some operating permits and power arrangements outstanding. No committed funding.","note":"Shallow calcrete (free-dig, beneficiated) project. Oct-2026 BFS: capex US$349.8M (up from US$230M in the 2024 FEED), 1.8 Mlb/yr average (692 tU; 2.0-2.3 Mlb early years), 46.1 Mlb over 26 years, reserve 37.3 Mlb, ~33% of the schedule is inferred material. Comp","rg":"Africa","own":{"Australia":85,"Africa":15}},{"id":"gurvanbulag","name":"Gurvanbulag (Emeelt Mines)","short":"Gurvanbulag","country":"Mongolia","iso2":"MN","region":"Dornod province","lat":49.05,"lon":113.85,"operator":"Emeelt Mines LLC (CNNC International)","owners":[{"name":"CNNC International Ltd (planned 49% once a mining licence is issued)","pct":null},{"name":"State of Mongolia (planned 51%)","pct":null}],"tickers":["CNNC (state)"],"method":"underground","status":"proposed","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2032,"late":2038},"planned_output_tu":{"low":null,"base":700,"high":null},"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":"Feasibility study approved by the government in 2014; exploration reported complete in 2015; still awaiting a mining licence and the state-CNNC joint venture; Red Book 2026 classes it 'prospective' with no start date","note":"Legacy Soviet-developed volcanic deposit (13,058 tU in situ at 0.152% U; DFS reserves 6,900 tU) with 560 m of existing underground workings, 100 km from the Chinese border. The old feasibility study showed 700 tU/yr for nine years at about US$280M capex and wa","rg":"Other Asia and Middle East","own":{"Other Asia and Middle East":100}},{"id":"zuuvch-ovoo","name":"Zuuvch-Ovoo and Dulaan Uul (Badrakh Energy)","short":"Zuuvch-Ovoo and Dulaan Uul","country":"Mongolia","iso2":"MN","region":"Dornogovi province (Ulaanbadrakh soum, Sainshand basin)","lat":43.76,"lon":110.3,"operator":"Badrakh Energy LLC (Orano)","owners":[{"name":"Orano","pct":66},{"name":"Mon-Atom LLC (State of Mongolia)","pct":34}],"tickers":["ORANO (private)","MON-ATOM (state)"],"method":"ISR","status":"development","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":null,"planned_start_year":2030,"start_year_range":{"early":2029,"late":2032},"planned_output_tu":{"low":null,"base":2500,"high":3000},"ramp_years":4,"expected_end_year":2060,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":"Mining licences 2016; feasibility study approved Jan 2025; investment agreement signed 17 Jan 2025 after parliamentary ratification (79% in favour); construction phase started June 2026","note":"The next large new uranium mine outside Kazakhstan: nominal ~2,500 tU/yr for 30 years by acid ISL, US$500M initial capex plus US$1.6bn over the mine life. Construction began June 2026 with a four-year development plan; the Red Book gives commercial production ","rg":"Other Asia and Middle East","own":{"Europe":66,"Other Asia and Middle East":34}},{"id":"jorf-lasfar-phosphate-uranium","name":"OCP / Uranext uranium-from-phosphoric-acid (Jorf Lasfar)","short":"OCP / Uranext uranium-from-phosphoric-acid","country":"Morocco","iso2":"MA","region":"El Jadida (Jorf Lasfar)","lat":33.127,"lon":-8.62,"operator":"Uranext (OCP Group / UM6P)","owners":[{"name":"OCP Group (via Uranext)","pct":null}],"tickers":["OCP (state)"],"method":"byproduct","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":2028,"start_year_range":{"early":2029,"late":2034},"planned_output_tu":null,"ramp_years":3,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Regulatory process for a ~US$100M first yellowcake unit at Moulay Abdellah (El Jadida) launched 29 May 2025; OCP in talks with EDF/Orano on an industrial partnership (Le Monde, Nov 2026).","note":"By-product recovery of uranium from phosphoric acid at OCP's Jorf Lasfar complex; press reports say a first plant could produce yellowcake 'as early as 2028' and OCP claims a successful small-scale trial. No capacity, resource or cost figures are published, so","rg":"Africa","own":{"Africa":100}},{"id":"etango","name":"Etango (Etango-8)","short":"Etango (Etango-8)","country":"Namibia","iso2":"NA","region":"Erongo (Namib Desert)","lat":-22.69,"lon":14.85,"operator":"Bannerman Energy (Etango JV with CNNC Overseas)","owners":[{"name":"Bannerman Energy","pct":52.25},{"name":"CNNC Overseas Ltd (CNUC/CNNC)","pct":42.75},{"name":"One Economy Foundation (loan-carried)","pct":5}],"tickers":["BMN","CNNC (state)"],"method":"heap-leach","status":"development","production_tu":{},"capacity_tu":1346,"first_production_year":null,"planned_start_year":2028,"start_year_range":{"early":2028,"late":2030},"planned_output_tu":{"low":1150,"base":1346,"high":1400},"ramp_years":2,"expected_end_year":2043,"cost_usd_lb":{"cash":null,"aisc":39.09,"basis":"Etango-8 DFS, cost estimates current as at June 2024 (+/-10%)","year":2024},"permitting_stage":"Fully permitted: mining licence (Dec 2023) and environmental approvals (up to 2,770 tU/yr). FID taken 23 Oct 2026; full-scale construction under way.","note":"FID taken 23 Oct 2026 after CNNC Overseas paid US$320.4M for 45% of the JV company (completed 25 Sep 2026); construction is fully funded with no project debt; CNOL takes 60% of output at market prices. 8 Mtpa open pit + heap leach, 3.5 Mlb U3O8/yr (1,346 tU) o","rg":"Africa","own":{"Australia":52.3,"China":42.8,"Africa":5}},{"id":"husab","name":"Husab","short":"Husab","country":"Namibia","iso2":"NA","region":"Erongo (Namib Desert)","lat":-22.58,"lon":15.03,"operator":"Swakop Uranium","owners":[{"name":"China General Nuclear (via CGN-URC 60% of Taurus Minerals)","pct":54},{"name":"China-Africa Development Fund (40% of Taurus Minerals)","pct":36},{"name":"Epangelo Mining (Namibian state)","pct":10}],"tickers":["CGN (state)","CHINA-AFRICA DEVELOPMENT FUND (state)","EPANGELO (state)"],"method":"open-pit","status":"operating","production_tu":{"2019":3400,"2020":3302,"2021":3309,"2022":3356,"2023":4510,"2024":4437,"2025":4605},"capacity_tu":5770,"first_production_year":2016,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published (state-owned, unlisted)","year":null},"permitting_stage":null,"note":"Record 2025: 5,430 t U3O8 drummed (x0.848 = 4,605 tU, +4% y/y) per Namibian Uranium Association; 2019-2024 from WNA per-mine table. Capacity = DFS nameplate 15 Mlb U3O8/yr (5,770 tU; WNA text also cites ~5,100 tU design) - never yet reached. CGN approved a com","rg":"Africa","own":{"China":90,"Africa":10}},{"id":"langer-heinrich","name":"Langer Heinrich","short":"Langer Heinrich","country":"Namibia","iso2":"NA","region":"Erongo (Namib-Naukluft Park)","lat":-22.815,"lon":15.334,"operator":"Paladin Energy","owners":[{"name":"Paladin Energy","pct":75},{"name":"CNNC Overseas Uranium Holding (CNUC/CNNC)","pct":25}],"tickers":["PDN","CNNC (state)"],"method":"open-pit","status":"operating","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":691,"2025":1554},"capacity_tu":2308,"first_production_year":2007,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2041,"cost_usd_lb":{"cash":43.3,"aisc":null,"basis":"FY2026 (Jul 2025-Jun 2026) actual 'cost of production' as reported by Paladin; FY2027 guidance US$44-48/lb; Sep-2026 quarter US$61.6/lb","year":2026},"permitting_stage":null,"note":"Restarted 30 Mar 2024 after 2018-24 care & maintenance; ramp-up declared complete June 2026. June fiscal year converted to calendar years from quarterlies: CY2024 691 tU (WNA); CY2025 1,554 tU (4.04 Mlb; Namibian Uranium Assoc. 1,832 t U3O8). FY2026 4.82 Mlb (","guidance_tu":{"2026":{"low":1800,"high":1900}},"rg":"Africa","own":{"Australia":75,"China":25}},{"id":"norasa","name":"Norasa (Valencia + Namibplaas)","short":"Norasa","country":"Namibia","iso2":"NA","region":"Erongo","lat":-22.346,"lon":15.235,"operator":"Asarian Energy (formerly Forsys Metals)","owners":[{"name":"Asarian Energy (formerly Forsys Metals)","pct":100}],"tickers":["ARN"],"method":"open-pit","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2032,"late":2038},"planned_output_tu":{"low":null,"base":2000,"high":2000},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":{"cash":34.72,"aisc":null,"basis":"March 2015 DFS life-of-mine operating cost (US$32.96/lb first five years) - outdated, revision pending","year":2015},"permitting_stage":"Mining licence ML149 (Valencia, valid to 2033, renewable); environmental clearance renewed Oct 2026; Namibplaas EPL 3638 under renewal. Feasibility revision not yet started.","note":"Forsys Metals renamed Asarian Energy (TSX: ARN). 2015 DFS: ~2,000 tU/yr (5.2 Mlb) over 15 years from very low-grade alaskite (~0.017% U). Company is infill drilling Namibplaas (Nov 2026) and preparing a revised feasibility study (7.5 vs 15 Mtpa, tank vs heap l","rg":"Africa","own":{"Africa":100}},{"id":"rossing","name":"Rössing","short":"Rössing","country":"Namibia","iso2":"NA","region":"Erongo (Namib Desert)","lat":-22.484,"lon":15.049,"operator":"Rössing Uranium Ltd (CNNC / China National Uranium Corp)","owners":[{"name":"China National Uranium Corporation (CNNC)","pct":68.62},{"name":"Iranian Foreign Investment Company","pct":15},{"name":"Industrial Development Corporation of South Africa","pct":10},{"name":"Government of Namibia","pct":3},{"name":"Other minority shareholders","pct":3.38}],"tickers":["CNNC (state)","IFIC (state)","IDC SOUTH AFRICA (state)"],"method":"open-pit","status":"operating","production_tu":{"2019":2077,"2020":2111,"2021":2444,"2022":2255,"2023":2476,"2024":2205,"2025":2701},"capacity_tu":3816,"first_production_year":1976,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2036,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published","year":null},"permitting_stage":null,"note":"2025 was the best year in over a decade: 3,185 t U3O8 (7.0 Mlb; 2,701 tU), +22.5% on 2024 (2,600 t U3O8), from company report; 2021-2024 match company 5-yr table x0.848, 2019-2020 from WNA. Nameplate 4,500 t U3O8/yr (3,816 tU). Approved life of mine to 2036 (P","rg":"Africa","own":{"China":68.6,"Other Asia and Middle East":15,"Africa":16.4}},{"id":"trekkopje","name":"Trekkopje","short":"Trekkopje","country":"Namibia","iso2":"NA","region":"Erongo (Namib Desert)","lat":-22.293,"lon":15.103,"operator":"Orano Mining Namibia","owners":[{"name":"Orano","pct":100}],"tickers":["ORANO (private)"],"method":"heap-leach","status":"care-maintenance","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":2011,"planned_start_year":null,"start_year_range":{"early":2030,"late":2035},"planned_output_tu":{"low":null,"base":null,"high":3200},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"none published; Areva said in 2012 the project needed ~US$75/lb","year":null},"permitting_stage":"Mining licence ML151 (2008) held; mothballed since 2012-13 with plant ~80% built. Orano is re-doing the DFS (through end-2026) and amending the environmental clearance to complete the plant; 'go-to-mine' decision targeted end-2026.","note":"Very low-grade (0.012-0.015% U) alkaline heap-leach project; pilot phase produced ~437 tU in 2011-13 then mothballed. Orano (which lost its Niger mines) is re-evaluating: DFS and pilot plant in 2026, decision targeted end-2026 - not yet announced. planned_outp","rg":"Africa","own":{"Europe":100}},{"id":"tumas","name":"Tumas","short":"Tumas","country":"Namibia","iso2":"NA","region":"Erongo (Namib-Naukluft Park)","lat":-22.98,"lon":15.05,"operator":"Deep Yellow (Reptile Uranium Namibia)","owners":[{"name":"Deep Yellow","pct":100}],"tickers":["DYL"],"method":"open-pit","status":"development","production_tu":{},"capacity_tu":1385,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2029,"late":2032},"planned_output_tu":{"low":1154,"base":1385,"high":1385},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":{"cash":34.36,"aisc":38.82,"basis":"DFS re-costing study Dec 2023 (C1 net of V2O5 credit; initial capex then US$360M); updated capital/operating estimate pending","year":2023},"permitting_stage":"Mining licence ML237 (20 years, to Sept 2043) and environmental clearances held; detailed engineering 85%; civil/concrete works under way; FID target withdrawn Oct 2026.","note":"FID deferred three times (Dec 2024, Apr 2025, and on 16 Oct 2026 the Q4-2026 FID target was withdrawn citing weak equity markets); no first-production date is currently stated. Civil and concrete works continue, funded from cash (A$144.7M at 30 Sep 2026); an o","rg":"Africa","own":{"Australia":100}},{"id":"wings-leonardville","name":"Wings (Leonardville) ISL project","short":"Wings (Leonardville) ISL project","country":"Namibia","iso2":"NA","region":"Omaheke (Stampriet Artesian Basin)","lat":-23.5,"lon":18.8,"operator":"Headspring Investments (Uranium One / Rosatom)","owners":[{"name":"Uranium One (Rosatom)","pct":100}],"tickers":["ROSATOM (state)"],"method":"ISR","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":2029,"start_year_range":{"early":2033,"late":2040},"planned_output_tu":{"low":null,"base":null,"high":3000},"ramp_years":4,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Exploration stage. Drilling permits were withdrawn in 2021; in Nov 2026 the water ministry authorised additional research boreholes only. IAEA review (Feb 2026) asked for stronger hydraulic-control evidence; no pilot-test or mining approval.","note":"Rosatom says it would invest up to US$500M for 3,000 tU/yr over 25+ years with mining from 2029, but the project sits in the transboundary Stampriet aquifer and faces organised farmer/water-sector opposition; only extra research drilling is authorised. No reso","rg":"Africa","own":{"Russia and Central Asia":100}},{"id":"azelik","name":"Azelik (SOMINA)","short":"Azelik (SOMINA)","country":"Niger","iso2":"NE","region":"Agadez (Teguidda)","lat":17.53,"lon":6.77,"operator":"SOMINA (CNNC-led)","owners":[{"name":"CNNC (CNNC International / CNUC)","pct":37.2},{"name":"Republic of Niger","pct":33},{"name":"ZXJOY Invest (China)","pct":24.8},{"name":"Korea Resources Corp (KORES)","pct":5}],"tickers":["CNNC (state)","NIGER (state)","KORES (state)"],"method":"open-pit","status":"care-maintenance","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":700,"first_production_year":2010,"planned_start_year":null,"start_year_range":{"early":2029,"late":2034},"planned_output_tu":{"low":null,"base":null,"high":700},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"On care and maintenance since Feb 2015. On 30 Mar 2026 Niger's mines minister ended the suspension subject to an updated feasibility study and a revised environmental and social impact assessment.","note":"Chinese-built mine that never reached its 700 tU/yr design (best ~290 tU est. in 2013) and closed in 2015 on cash-flow grounds. Restart has been talked up since May 2024; in Mar 2026 Niger lifted the suspension with conditions, but CNNC International reported ","rg":"Africa","own":{"China":62,"Africa":33,"Other Asia and Middle East":5}},{"id":"cominak","name":"COMINAK (Akouta)","short":"COMINAK (Akouta)","country":"Niger","iso2":"NE","region":"Agadez (Akokan, Tim Mersoï Basin)","lat":18.7,"lon":7.3,"operator":"Orano (remediation; no site access since 2023-24)","owners":[{"name":"Orano","pct":59},{"name":"SOPAMIN (Niger state)","pct":31},{"name":"ENUSA (Spain)","pct":10}],"tickers":["ORANO (private)","NIGER (state)","ENUSA (state)"],"method":"underground","status":"closed","production_tu":{"2019":1071,"2020":1112,"2021":252,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":1978,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2021,"cost_usd_lb":null,"permitting_stage":null,"note":"Underground mine closed 31 March 2021 on reserve exhaustion after ~75,000 tU since 1978; under remediation (Orano declared loss of operational control of its Niger sites in Dec 2024). 2020 (1,112 tU) from Orano annual report, 2021 from WNA; 2019 is est. (WNA N","rg":"Africa","own":{"Europe":69,"Africa":31}},{"id":"dasa","name":"Dasa","short":"Dasa","country":"Niger","iso2":"NE","region":"Agadez (Adrar Emoles 3, Tim Mersoï Basin)","lat":17.8,"lon":7.75,"operator":"SOMIDA (Global Atomic)","owners":[{"name":"Global Atomic","pct":80},{"name":"Republic of Niger","pct":20}],"tickers":["GLO","NIGER (state)"],"method":"underground","status":"development","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":2028,"start_year_range":{"early":2029,"late":2032},"planned_output_tu":{"low":null,"base":1103,"high":1414},"ramp_years":2,"expected_end_year":2052,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"2024 FS unit costs not re-verified here and pre-date a 74% rise in direct capex; older Phase-1 FS (2021) showed cash US$19.02 / AISC US$22.13 per lb","year":null},"permitting_stage":"Mining permit (Dec 2020) and environmental certificate held; underground development since Nov 2022 (4th level); plant civils ~47% complete. US DFC board approved up to US$414.2M debt (16 Sep 2026), conditional on an export route, extension of the mining convention/permit, and US$152.7M more equity.","note":"High-grade (~0.5% U3O8) underground mine; ore stockpiled since 2024 but the plant is unfinished. Schedule has slipped from 'early 2026' to commissioning in H2 2028 (construction complete H1 2028). Capex now US$777M incl. financing (direct costs +74% vs 2024 FS","rg":"Africa","own":{"Africa":100}},{"id":"imouraren","name":"Imouraren","short":"Imouraren","country":"Niger","iso2":"NE","region":"Agadez (Tim Mersoï Basin)","lat":18.091,"lon":7.441,"operator":"None (permit withdrawn from Orano's Imouraren SA; reverted to the State of Niger)","owners":[{"name":"Republic of Niger (permit reverted June 2024; Orano/KEPCO claim under ICSID arbitration)","pct":null}],"tickers":["NIGER (state)","ORANO (private)"],"method":"open-pit","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2034,"late":2040},"planned_output_tu":{"low":null,"base":null,"high":5000},"ramp_years":4,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Operating permit withdrawn from Orano on 19-20 June 2024; Orano filed ICSID arbitration Dec 2024. No current licensed developer; Niger's TNUC signed a cooperation memorandum with Rosatom's Uranium One (Dec 2025) covering new deposits generally.","note":"One of the world's largest undeveloped deposits (~200,000 tU at ~0.08%) but stranded: Orano's licence was revoked in June 2024, days after it announced a restart of works, and the dispute is in arbitration. Original Areva design was 5,000 tU/yr for 35 years (s","rg":"Africa","own":{"Africa":100}},{"id":"madaouela","name":"Madaouela","short":"Madaouela","country":"Niger","iso2":"NE","region":"Agadez (Arlit, Tim Mersoï Basin)","lat":18.62,"lon":7.42,"operator":"MAMICO (Atomic Eagle, formerly GoviEx Uranium)","owners":[{"name":"Atomic Eagle (formerly GoviEx Uranium)","pct":60},{"name":"Republic of Niger (15% free-carried + 25% contributing)","pct":40}],"tickers":["AEU","NIGER (state)"],"method":"underground","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2031,"late":2036},"planned_output_tu":{"low":null,"base":1027,"high":1040},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"GoviEx 2022 FS now historical; re-optimisation under way (earlier PFS: US$24.5/lb operating, US$31.5 incl. royalties)","year":null},"permitting_stage":"Permit withdrawn July 2024; reinstated to new subsidiary MAMICO under a mining convention agreed Aug 2026 and signed 24 Sep 2026 (ICSID case to be withdrawn). Resource being restated to JORC by end-2026; technical review/optimisation started Sep 2026.","note":"Back in play: Niger re-granted the Madaouela I permit to Atomic Eagle (60%) with the state at 40% (US$5M on signing, US$5M at construction start; state may buy/market its share and requisition up to 50% of output in some circumstances). GoviEx's 2022 FS: 50.8 ","rg":"Africa","own":{"Africa":100}},{"id":"somair","name":"SOMAÏR (Arlit) / TSUMCO","short":"SOMAÏR (Arlit) / TSUMCO","country":"Niger","iso2":"NE","region":"Agadez (Arlit, Tim Mersoï Basin)","lat":18.752,"lon":7.313,"operator":"TSUMCO SA (Niger state; replaced nationalised SOMAÏR in 2026)","owners":[{"name":"Republic of Niger (nationalised June 2025; Orano's former 63.4% disputed at ICSID)","pct":100}],"tickers":["NIGER (state)"],"method":"open-pit","status":"operating","production_tu":{"2019":1912,"2020":1879,"2021":1996,"2022":2020,"2023":1130,"2024":959,"2025":300},"capacity_tu":2000,"first_production_year":1971,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2040,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published","year":null},"permitting_stage":null,"note":"Opaque since Orano lost control (Dec 2024). 2020-2024 are Orano/WNA actuals; the 2019 split (SOMAÏR 1,912 / COMINAK 1,071) is est.: Orano-reported figures as recalled, fitted to the WNA country total of 2,983 tU, not re-verified. 2025 figure is an est., not an","rg":"Africa","own":{"Europe":100}},{"id":"dera-ghazi-khan","name":"Dera Ghazi Khan (Baghalchur mill; Sulaiman Range mines) - PAEC national aggregate","short":"Dera Ghazi Khan (Baghalchur mill; Sulaiman Range mines) - PAEC national aggregate","country":"Pakistan","iso2":"PK","region":"Punjab (Dera Ghazi Khan district)","lat":30.238,"lon":70.286,"operator":"Pakistan Atomic Energy Commission (PAEC)","owners":[{"name":"Pakistan Atomic Energy Commission (state)","pct":100}],"tickers":["PAEC (state)"],"method":"ISR","status":"operating","production_tu":{"2019":45,"2020":35,"2021":47,"2022":50,"2023":50,"2024":50,"2025":50},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"AGGREGATE for all PAEC uranium output (no site split is published; do not add the Qabul Khel record). 2020-2022 (35 / 47 / 50 tU) are the Red Book 2024 table values (its text cites 55 and 59 tU for 2021-22); 2019 = 45 is a WNA est. and 2023-2025 = 50 are Red B","rg":"Other Asia and Middle East","own":{"Other Asia and Middle East":100}},{"id":"qabul-khel-shanawa","name":"Qabul Khel / Shanawa ISL (Bannu Basin - Kohat Plateau)","short":"Qabul Khel / Shanawa ISL","country":"Pakistan","iso2":"PK","region":"Khyber Pakhtunkhwa (Lakki Marwat / Karak districts)","lat":32.82,"lon":71.18,"operator":"Pakistan Atomic Energy Commission (PAEC)","owners":[{"name":"Pakistan Atomic Energy Commission (state)","pct":100}],"tickers":["PAEC (state)"],"method":"ISR","status":"operating","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"Sub-record: output is not published and is counted in the dera-ghazi-khan national aggregate (do not double count). The Red Book describes alkaline (ammonium bicarbonate) ISL in poorly consolidated Bannu Basin sandstones, semi-commercial since the mid-1990s, a","rg":"Other Asia and Middle East","own":{"Other Asia and Middle East":100}},{"id":"macusani","name":"Macusani","short":"Macusani","country":"Peru","iso2":"PE","region":"Puno (Macusani Plateau)","lat":-14.069,"lon":-70.431,"operator":"American Lithium (Macusani Yellowcake)","owners":[{"name":"American Lithium","pct":100}],"tickers":["TSXV:LI"],"method":"open-pit","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2033,"late":2040},"planned_output_tu":{"low":null,"base":2300,"high":null},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":{"cash":17.28,"aisc":null,"basis":"January 2016 PEA cash cost (stale; updated PEA pending)","year":2016},"permitting_stage":"Resource/PEA stage; updated PEA in preparation; status of Peru's uranium-specific mining regulations not verified","note":"Still owned by American Lithium (2022 spin-out plan was shelved). New resource (effective 1 Jul 2026): 57.16 Mlb U3O8 measured+indicated and 65.32 Mlb inferred, low grade, near surface; company is 'advancing towards updated PEA' (Nov 2026). 2016 PEA: open pits","rg":"South America","own":{"South America":100}},{"id":"dalur","name":"Dalur (Dalmatovskoye, Khokhlovskoye, Dobrovolnoye ISL)","short":"Dalur","country":"Russia","iso2":"RU","region":"Kurgan Oblast (Trans-Urals)","lat":55.93,"lon":62.98,"operator":"JSC Dalur","owners":[{"name":"Rosatom (via Rosatom Nedra, formerly ARMZ)","pct":100}],"tickers":["ROSATOM (state)"],"method":"ISR","status":"operating","production_tu":{"2019":595,"2020":585,"2021":585,"2022":585,"2023":587,"2024":588,"2025":590},"capacity_tu":600,"first_production_year":2004,"planned_start_year":null,"start_year_range":null,"planned_output_tu":{"low":590,"base":700,"high":700},"ramp_years":null,"expected_end_year":2045,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"Steady ~585-595 tU/yr ISL operation. 2019-2022 and 2024 are published actuals; 2023 (587) and 2025 (590) are est. - neither year was split by enterprise, so I hold Dalur flat and reconcile to the official national totals (2,710 and 2,623 tU). Dobrovolnoye (res","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"elkon","name":"Elkon","short":"Elkon","country":"Russia","iso2":"RU","region":"Sakha Republic (Yakutia), Aldan district","lat":58.7,"lon":125.95,"operator":"JSC Elkon Mining and Metallurgical Combine (EMMC)","owners":[{"name":"Rosatom (via Rosatom Nedra)","pct":100}],"tickers":["ROSATOM (state)"],"method":"underground","status":"proposed","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":null,"planned_start_year":2035,"start_year_range":{"early":2034,"late":2040},"planned_output_tu":{"low":1500,"base":2000,"high":5000},"ramp_years":10,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":"Suspended since 2017; Rosatom Nedra said in Feb 2026 it plans to bring the project 'out of hibernation'; currently only the Severnoye gold operation (1.5 t Au in 2025) is active","note":"Russia's largest uranium resource (303,000 tU recoverable at 0.15% U, with gold) but remote, deep and low-margin. Current concept per WNA: recover some uranium from already gold-leached oxidised ore from about 2028-29, then primary ore with main output from ~2","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"khiagda","name":"Khiagda (Vitim district ISL)","short":"Khiagda","country":"Russia","iso2":"RU","region":"Republic of Buryatia (Bauntovsky Evenki district)","lat":54.15,"lon":113.1,"operator":"JSC Khiagda","owners":[{"name":"Rosatom (via Rosatom Nedra, formerly ARMZ)","pct":100}],"tickers":["ROSATOM (state)"],"method":"ISR","status":"operating","production_tu":{"2019":1016,"2020":1021,"2021":900,"2022":920,"2023":1068,"2024":1103,"2025":1090},"capacity_tu":1300,"first_production_year":2010,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2045,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"Russia's largest producer since 2024 (1,103 tU, official). 2019-2022 and 2024 are published actuals. 2023 is an est.: Russia's ISL total was 1,655 tU (Red Book 2026); I assume Dalur at ~587 and assign the residual 1,068 to Khiagda (WNA's table shows 950 for 20","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"priargunsky-mine-6","name":"Priargunsky Mine No. 6 (Argunskoye and Zherlovoye deposits)","short":"Priargunsky Mine No. 6","country":"Russia","iso2":"RU","region":"Zabaykalsky Krai (Krasnokamensk)","lat":50.12,"lon":118.22,"operator":"PJSC Priargunsky Industrial Mining and Chemical Union (PIMCU)","owners":[{"name":"Rosatom (via PIMCU / Rosatom Nedra)","pct":null}],"tickers":["ROSATOM (state)"],"method":"underground","status":"development","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":null,"planned_start_year":2030,"start_year_range":{"early":2030,"late":2033},"planned_output_tu":{"low":1500,"base":2300,"high":2300},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":"Construction recommenced March 2018: surface complex, hoisting facilities and mine-water treatment in place or in progress, mine dewatered below level 12, shaft 20V construction design cleared state expert review in 2025","note":"Russia's key replacement mine: design capacity 2,300 tU/yr, described as PIMCU's main source for 40-50 years. First uranium has slipped repeatedly (2015 -> 2023 -> 2028 -> 2029 in Russia's Red Book 2026 submission -> 2030 per WNA Oct 2026); full capacity is ta","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"priargunsky-pimcu","name":"Priargunsky (PIMCU; Streltsovsk mines No. 1 and No. 8)","short":"Priargunsky","country":"Russia","iso2":"RU","region":"Zabaykalsky Krai (Krasnokamensk)","lat":50.08,"lon":118.15,"operator":"PJSC Priargunsky Industrial Mining and Chemical Union (PIMCU)","owners":[{"name":"Rosatom (via Rosatom Nedra, formerly ARMZ; PIMCU is a PJSC with minority holders)","pct":null}],"tickers":["ROSATOM (state)"],"method":"underground","status":"operating","production_tu":{"2019":1300,"2020":1240,"2021":1150,"2022":1002,"2023":1055,"2024":1047,"2025":943},"capacity_tu":1200,"first_production_year":1968,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2040,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"2019-2024 are published actuals (2024: 978 tU via the hydromet plant + 69 tU heap leach). 2025 is an est.: Rosatom's mining division reported 2,623 tU in total for 2025 ('decline due to depletion of operating mines') without a split; I apply the Red Book 2026 ","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"shirondukuyskoye","name":"Shirondukuyskoye (PIMCU molybdenum-uranium deposit)","short":"Shirondukuyskoye","country":"Russia","iso2":"RU","region":"Zabaykalsky Krai (Krasnokamensk)","lat":50.13,"lon":118.13,"operator":"PJSC Priargunsky Industrial Mining and Chemical Union (PIMCU)","owners":[{"name":"Rosatom (via PIMCU / Rosatom Nedra)","pct":null}],"tickers":["ROSATOM (state)"],"method":"underground","status":"development","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":null,"planned_start_year":2028,"start_year_range":{"early":2028,"late":2030},"planned_output_tu":{"low":null,"base":400,"high":null},"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":"Development licence obtained Feb 2025; underground development from existing PIMCU workings under way (3 km of drives completed mid-2026); bulk of capital mining work due in 2026","note":"Brownfield deposit 8 km from Krasnokamensk, accessed from existing infrastructure; Rosatom Nedra plans about 400 tU/yr from 2028 to bridge the decline of mines 1 and 8 before Mine 6. Reserves 8,000 tU (Russian C1+C2) plus molybdenum. Late end of the range is m","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"beisa","name":"Beisa (Beatrix 4 Shaft)","short":"Beisa","country":"South Africa","iso2":"ZA","region":"Free State (Welkom-Virginia goldfield, Witwatersrand Basin)","lat":-28.25,"lon":26.8,"operator":"Neo Energy Metals (acquisition from Sibanye-Stillwater pending)","owners":[{"name":"Sibanye-Stillwater (vendor until completion; to hold ~40% of Neo Energy Metals)","pct":100}],"tickers":["SBSW","NEO"],"method":"underground","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":2028,"start_year_range":{"early":2029,"late":2033},"planned_output_tu":{"low":null,"base":312,"high":312},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"R500M sale of Beatrix 4 Shaft/Beisa agreed Dec 2024; Section 102 carve-out and Section 11 transfer approvals from the mineral regulator still outstanding (deadlines extended to 6 Dec 2026 and June 2027).","note":"Brownfield uranium-gold underground restart (mined 1981-84). Neo targets first gold in Dec 2027 followed by uranium (planned_start_year 2028 is my reading of that), initially ~810,000 lb U3O8/yr (312 tU) plus ~52,000 oz gold. Deal not closed, funding thin (GBP","rg":"Africa","own":{"Africa":100}},{"id":"cooke-tailings","name":"Cooke Uranium Project (tailings retreatment)","short":"Cooke Uranium Project","country":"South Africa","iso2":"ZA","region":"Gauteng (West Rand, Randfontein)","lat":-26.25,"lon":27.7,"operator":"Sibanye-Stillwater (Rand Uranium)","owners":[{"name":"Sibanye-Stillwater","pct":100}],"tickers":["SBSW"],"method":"byproduct","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2030,"late":2035},"planned_output_tu":null,"ramp_years":2,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Feasibility study completed with a maiden mineral reserve (Sibanye FY2025 report); environmental and social impact assessment and water-use licence processes opened Sept 2025 (SLR); no investment decision.","note":"Hydro-mining of the Cooke tailings dam with a new uranium/gold plant beside the Cooke gold plant; Sibanye classes it a development project and has a uranium-for-SMRs partnership with C5 Capital. Annual uranium output from the 2025 FS was not found, so planned_","rg":"Africa","own":{"Africa":100}},{"id":"moab-khotsong","name":"Moab Khotsong (Vaal River by-product uranium)","short":"Moab Khotsong","country":"South Africa","iso2":"ZA","region":"North West / Free State border (Klerksdorp goldfield, Witwatersrand Basin)","lat":-26.979,"lon":26.782,"operator":"Harmony Gold","owners":[{"name":"Harmony Gold Mining","pct":100}],"tickers":["HMY"],"method":"byproduct","status":"operating","production_tu":{"2019":346,"2020":250,"2021":192,"2022":200,"2023":200,"2024":200,"2025":190},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"by-product of gold; no unit cost published","year":null},"permitting_stage":null,"note":"South Africa's only current uranium producer: by-product from Moab Khotsong gold ore (South Uranium Plant; calcined at Nufcor). 2019-2024 values are the WNA 'Vaal River' series, which WNA itself marks as est. from 2021; they equal the whole WNA South Africa li","rg":"Africa","own":{"Africa":100}},{"id":"salamanca-retortillo","name":"Salamanca (Retortillo)","short":"Salamanca","country":"Spain","iso2":"ES","region":"Castilla y León (Salamanca)","lat":40.802,"lon":-6.36,"operator":"Berkeley Energia (Berkeley Minera España)","owners":[{"name":"Berkeley Energia","pct":100}],"tickers":["ASX:BKY","LSE:BKY","BME:BKY"],"method":"open-pit","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2031,"late":2040},"planned_output_tu":{"low":null,"base":1692,"high":null},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":{"cash":13.3,"aisc":null,"basis":"July 2016 DFS cash cost (total cash cost US$15.06/lb); stale","year":2016},"permitting_stage":"Blocked: MITECO refused the NSC II construction authorisation for the concentrate plant in Nov 2021 (appeal rejected Feb 2023); mining licence (2014) and municipal works permit (2020) held; ICSID arbitration under way","note":"Fully designed open-pit/heap-leach project (2016 DFS: 4.4 Mlb U3O8/yr for ten years, US$93.8M initial capex) stopped by the Spanish government's refusal of the last nuclear authorisation. Berkeley filed its ICSID Memorial in Feb 2026 claiming US$1.25bn; procee","rg":"Europe","own":{"Europe":100}},{"id":"haggan","name":"Häggån","short":"Häggån","country":"Sweden","iso2":"SE","region":"Jämtland (Berg municipality)","lat":62.93,"lon":14.33,"operator":"Aura Energy (Vanadis Battery Metals AB)","owners":[{"name":"Aura Energy","pct":100}],"tickers":["ASX:AEE","AIM:AURA"],"method":"open-pit","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2036,"late":2045},"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Scoping study (Sept 2023) covered vanadium and potash only, with uranium sent to tailings under the then ban; exploitation-concession process pending; SGU proposed the deposit as a 'national interest' in 2026","note":"~800 Mlb U3O8 in alum shale alongside 13+ billion lb V2O5. The 2023 scoping study (3.5 Mtpa, US$592M capex) quoted NPV with and without uranium but no uranium production rate; with the Swedish ban lifted from 1 Jan 2026 uranium recovery can be added, but no up","rg":"Europe","own":{"Australia":100}},{"id":"viken","name":"Viken","short":"Viken","country":"Sweden","iso2":"SE","region":"Jämtland","lat":63,"lon":14.35,"operator":"District Metals","owners":[{"name":"District Metals","pct":100}],"tickers":["TSXV:DMX","ASX:DMX"],"method":"open-pit","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2034,"late":2040},"planned_output_tu":{"low":null,"base":1269,"high":null},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":null,"permitting_stage":"Exploration licences; PEA (June 2026); no exploitation concession or environmental permit applications yet; Sweden's uranium mining ban repealed 1 Jan 2026 and municipal veto removed 15 Jul 2026","note":"Alum-shale polymetallic deposit (U-V-K-Mo-Ni-Cu-Zn): 176 Mlb U3O8 indicated and 1.5 billion lb inferred at ~160-175 ppm - the largest undeveloped uranium resource by contained metal. 2026 PEA: open pit, average 3.3 Mlb U3O8/yr over 13 years with 16 Mlb V2O5 an","rg":"Europe","own":{"Europe":100}},{"id":"mkuju-river","name":"Mkuju River (Nyota)","short":"Mkuju River (Nyota)","country":"Tanzania","iso2":"TZ","region":"Ruvuma (Namtumbo District)","lat":-10.05,"lon":36.55,"operator":"Mantra Tanzania (Uranium One / Rosatom)","owners":[{"name":"Uranium One (Rosatom)","pct":80},{"name":"Government of Tanzania","pct":20}],"tickers":["ROSATOM (state)"],"method":"open-pit","status":"development","production_tu":{},"capacity_tu":3000,"first_production_year":null,"planned_start_year":2029,"start_year_range":{"early":2030,"late":2035},"planned_output_tu":{"low":1400,"base":null,"high":3000},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"no current estimate; pre-2017 Uranium One figures (cash ~US$25/lb, all-in >US$50/lb per WNA) are outdated","year":null},"permitting_stage":"Special Mining Licence granted April 2013 - expires April 2028 (government says it will not revoke it; renewal needed). Pilot plant commissioned July 2025; main-complex construction was scheduled to start in 2026 with commissioning in 2029; financing with Russian and Tanzanian banks not yet closed.","note":"Rosatom's long-stalled ~US$1-1.2bn project inside the former Selous reserve. Pilot plant (July 2025) has treated ~2,500 t of ore; as of mid-2026 Mantra was 'preparing' main-plant construction and still negotiating bank finance, with lenders wary of the April-2","rg":"Africa","own":{"Russia and Central Asia":80,"Africa":20}},{"id":"ingulska","name":"Ingulska mine (Michurinske and Tsentralne deposits)","short":"Ingulska mine","country":"Ukraine","iso2":"UA","region":"Kirovohrad Oblast (Kropyvnytskyi)","lat":48.47,"lon":32.21,"operator":"SkhidGZK (VostGOK)","owners":[{"name":"SE Eastern Mining and Processing Plant (SkhidGZK / VostGOK; State of Ukraine, Ministry of Energy)","pct":100}],"tickers":["SKHIDGZK (state)"],"method":"underground","status":"operating","production_tu":{"2019":320,"2020":284,"2021":198,"2022":48,"2023":158,"2024":165,"2025":150},"capacity_tu":450,"first_production_year":1968,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"SkhidGZK reports one figure for the Zhovti Vody mill; totals used are 801 tU (2019, WNA), then Red Book: 711 (2020), 496 (2021), 120 (2022), 350 (2023), 329 (2024) and 300 expected for 2025 (WNA's table has 744 / 455 / 100 / 340 / 288). Per-mine numbers are es","rg":"Europe","own":{"Europe":100}},{"id":"novokostiantynivska","name":"Novokostiantynivska mine","short":"Novokostiantynivska mine","country":"Ukraine","iso2":"UA","region":"Kirovohrad Oblast (Mala Vyska area)","lat":48.57,"lon":31.73,"operator":"SkhidGZK (VostGOK)","owners":[{"name":"SE Eastern Mining and Processing Plant (SkhidGZK / VostGOK; State of Ukraine, Ministry of Energy)","pct":100}],"tickers":["SKHIDGZK (state)"],"method":"underground","status":"operating","production_tu":{"2019":320,"2020":284,"2021":198,"2022":48,"2023":157,"2024":164,"2025":150},"capacity_tu":1500,"first_production_year":2011,"planned_start_year":null,"start_year_range":null,"planned_output_tu":{"low":300,"base":800,"high":1500},"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"SkhidGZK reports one figure for the Zhovti Vody mill; totals used are 801 tU (2019, WNA), then Red Book: 711 (2020), 496 (2021), 120 (2022), 350 (2023), 329 (2024) and 300 expected for 2025 (WNA's table has 744 / 455 / 100 / 340 / 288). Per-mine numbers are es","rg":"Europe","own":{"Europe":100}},{"id":"safonivske","name":"Safonivske (Safonovka) ISL project","short":"Safonivske (Safonovka) ISL project","country":"Ukraine","iso2":"UA","region":"Mykolaiv Oblast","lat":47.85,"lon":32.75,"operator":"Nuclear Energy Systems of Ukraine LLC (private)","owners":[{"name":"Nuclear Energy Systems of Ukraine LLC (private)","pct":null}],"tickers":["NUCLEAR ENERGY SYSTEMS OF UKRAINE (private)"],"method":"ISR","status":"proposed","production_tu":{"2023":0,"2024":0,"2025":0},"capacity_tu":150,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2028,"late":2033},"planned_output_tu":{"low":null,"base":150,"high":null},"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":"Listed as a 'planned' production centre in Ukraine's Red Book 2026 submission (no first-production date); wartime conditions","note":"Small sandstone ISL deposit (2,248 tU recoverable at 0.02% U; nominal 150 tU/yr). Sources conflict: WNA says a private company has been leaching palaeochannels here since about 2020, but Ukraine's Red Book data show zero ISL production in 2023-2025 and classif","rg":"Europe","own":{"Europe":100}},{"id":"smolinska","name":"Smolinska mine (Vatutinske deposit)","short":"Smolinska mine","country":"Ukraine","iso2":"UA","region":"Kirovohrad Oblast (Smoline)","lat":48.6,"lon":31.3,"operator":"SkhidGZK (VostGOK)","owners":[{"name":"SE Eastern Mining and Processing Plant (SkhidGZK / VostGOK; State of Ukraine, Ministry of Energy)","pct":100}],"tickers":["SKHIDGZK (state)"],"method":"underground","status":"closed","production_tu":{"2019":161,"2020":143,"2021":100,"2022":24,"2023":35,"2024":0,"2025":0},"capacity_tu":500,"first_production_year":1973,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2023,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"SkhidGZK reports one figure for the Zhovti Vody mill; totals used are 801 tU (2019, WNA), then Red Book: 711 (2020), 496 (2021), 120 (2022), 350 (2023), 329 (2024) and 300 expected for 2025 (WNA's table has 744 / 455 / 100 / 340 / 288). Per-mine numbers are es","rg":"Europe","own":{"Europe":100}},{"id":"alta-mesa","name":"Alta Mesa CPP & wellfields","short":"Alta Mesa CPP & wellfields","country":"United States","iso2":"US","region":"Texas (Brooks County)","lat":26.9,"lon":-98.31,"operator":"enCore Energy (enCore Alta Mesa LLC)","owners":[{"name":"enCore Energy","pct":70},{"name":"Boss Energy","pct":30}],"tickers":["EU","BOE.AX"],"method":"ISR","status":"ramp-up","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":64,"2025":230},"capacity_tu":577,"first_production_year":2005,"planned_start_year":2024,"start_year_range":{"early":2024,"late":2024},"planned_output_tu":{"low":60,"base":230,"high":385},"ramp_years":4,"expected_end_year":null,"cost_usd_lb":{"cash":29.48,"aisc":null,"basis":"enCore 2025 actual cash cost of extracted lb (plus $12.42 non-cash); H1 2026 extraction cost rose to $57.36/lb on low volume","year":2025},"permitting_stage":"Operating licence; TCEQ production-area authorisations pending: PAA-3 Extension (expected by end-2026) and PAA-8 (early 2027)","note":"Restarted June 2024; peaked at 206 klb drummed in Q3 2025, then collapsed in 2026 (EIA: 97,022 / 44,813 / 10,179 lb in Q1-Q3, i.e. 58 tU YTD) as depleted wellfields were not replaced because of TCEQ permitting delays; plant output stopped in Q3 2026 pending ne","rg":"North America","own":{"North America":70,"Australia":30}},{"id":"bullfrog","name":"Bullfrog (Henry Mountains)","short":"Bullfrog","country":"United States","iso2":"US","region":"Utah (Garfield County, Henry Mountains)","lat":37.83,"lon":-110.72,"operator":"Energy Fuels","owners":[{"name":"Energy Fuels","pct":100}],"tickers":["UUUU"],"method":"underground","status":"proposed","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2029,"late":2034},"planned_output_tu":{"low":150,"base":300,"high":385},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published","year":null},"permitting_stage":"Permitting and development work in progress (Energy Fuels Q3 2026); 2022 S-K 1300 technical report; no mine plan published","note":"Indicated 9.1 Mlb at 0.29% + inferred 2.0 Mlb; undeveloped deposit north of the Tony M mine, ore would be trucked ~120 km to White Mesa. No production rate or start date published; output range is est. from the company's combined '>5 Mlb/yr' for Roca Honda (2.","rg":"North America","own":{"North America":100}},{"id":"burke-hollow","name":"Burke Hollow","short":"Burke Hollow","country":"United States","iso2":"US","region":"Texas (Bee County)","lat":28.24,"lon":-97.53,"operator":"Uranium Energy Corp","owners":[{"name":"Uranium Energy Corp","pct":100}],"tickers":["UEC"],"method":"ISR","status":"ramp-up","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":385,"first_production_year":2026,"planned_start_year":2026,"start_year_range":{"early":2026,"late":2026},"planned_output_tu":{"low":40,"base":190,"high":385},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":{"cash":36.13,"aisc":null,"basis":"UEC fiscal Q4 2026 (May-Jul 2026) actual, first full quarter: total cash cost $36.13/lb, total cost $39.93/lb on 17,352 lb","year":2026},"permitting_stage":"Operating; TCEQ approval and first production 8 April 2026","note":"First new US ISR mine in over a decade: production began 8 Apr 2026, first resin reached the Hobson CPP mid-May; 17,352 lb produced May-Jul 2026 from 126 wells in part of Production Area 1 (2,500 gpm satellite IX). EIA's Q3 2026 table shows 17,352 lb against b","rg":"North America","own":{"North America":100}},{"id":"christensen-ranch-irigaray","name":"Christensen Ranch / Irigaray CPP (Willow Creek)","short":"Christensen Ranch / Irigaray CPP","country":"United States","iso2":"US","region":"Wyoming (Powder River Basin, Johnson/Campbell Counties)","lat":43.8,"lon":-106.03,"operator":"Uranium Energy Corp","owners":[{"name":"Uranium Energy Corp","pct":100}],"tickers":["UEC"],"method":"ISR","status":"ramp-up","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":37},"capacity_tu":500,"first_production_year":2011,"planned_start_year":2024,"start_year_range":{"early":2024,"late":2024},"planned_output_tu":{"low":80,"base":190,"high":385},"ramp_years":4,"expected_end_year":null,"cost_usd_lb":{"cash":34.09,"aisc":null,"basis":"UEC FY2026 (Aug 2025-Jul 2026) actual: total cash cost $34.09/lb, total cost incl. DD&A $39.94/lb on 211,942 lb","year":2026},"permitting_stage":"Operating; Irigaray CPP licensed capacity raised to 4.0 Mlb/yr (2024); new header houses need case-by-case WDEQ approval","note":"Restarted Aug 2024 (first drummed product Feb 2025); earlier Uranium One operation ran 2011-2018. Production = EIA 'Willow Creek' concentrate (26,421 lb Q3 + 68,612 lb Q4 2025; EIA quarters mirror UEC fiscal quarters, i.e. lag ~2 months). On UEC's own basis (p","rg":"North America","own":{"North America":100}},{"id":"church-rock-crownpoint","name":"Crownpoint-Churchrock ISR","short":"Crownpoint-Churchrock ISR","country":"United States","iso2":"US","region":"New Mexico (Grants Mineral Belt, McKinley County)","lat":35.65,"lon":-108.52,"operator":"Laramide Resources (NuFuels / Hydro Resources Inc.)","owners":[{"name":"Laramide Resources","pct":100}],"tickers":["LAM.TO"],"method":"ISR","status":"proposed","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":1154,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2031,"late":2038},"planned_output_tu":{"low":190,"base":385,"high":385},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":35,"basis":"PEA Jan 2024 (Church Rock): all-in sustaining cost ~US$35/lb; 31.2 Mlb over 31 years (as summarised by WNA)","year":2024},"permitting_stage":"NRC licence in place (CPP up to 3 Mlb/yr); FAST-41 covered project (June 2025); NMED groundwater discharge permit DP-2004 at public-notice stage (June 2026); other state/tribal approvals outstanding","note":"Two ISR deposits under one NRC licence: Church Rock 50.8 Mlb inferred (0.075% eU3O8) and Laramide's 5.1 Mlb share of Crownpoint (all inferred, no reserves). PEA averages ~1 Mlb/yr (31.2 Mlb / 31 yr). Long-contested project next to the Navajo Nation, whose uran","rg":"North America","own":{"North America":100}},{"id":"crow-butte","name":"Crow Butte","short":"Crow Butte","country":"United States","iso2":"US","region":"Nebraska (Dawes County)","lat":42.645,"lon":-103.355,"operator":"Cameco Resources (Crow Butte Resources Inc.)","owners":[{"name":"Cameco","pct":100}],"tickers":["CCJ"],"method":"ISR","status":"care-maintenance","production_tu":{"2021":3,"2022":2,"2023":1,"2024":3,"2025":2},"capacity_tu":769,"first_production_year":1991,"planned_start_year":null,"start_year_range":{"early":2029,"late":2035},"planned_output_tu":{"low":100,"base":200,"high":385},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published (assets fully impaired; care & maintenance)","year":null},"permitting_stage":"NRC operating licence renewed July 2026, term through 2046; no restart decision","note":"Curtailed 2016; EIA status 'restoration' with small residual recoveries (6,457 lb 2024; 5,981 lb 2025; 458 lb Jan-Sep 2026). NRC renewed the licence in July 2026 to 2046, which keeps a restart option open but Cameco plans no 2026 production. Cameco licensed ca","rg":"North America","own":{"North America":100}},{"id":"dewey-burdock","name":"Dewey Burdock","short":"Dewey Burdock","country":"United States","iso2":"US","region":"South Dakota (Fall River/Custer Counties)","lat":43.47,"lon":-103.98,"operator":"enCore Energy","owners":[{"name":"enCore Energy","pct":100}],"tickers":["EU"],"method":"ISR","status":"development","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":385,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2029,"late":2032},"planned_output_tu":{"low":200,"base":300,"high":385},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":{"cash":23.81,"aisc":null,"basis":"PEA (S-K 1300, Jan 2025): operating cost incl. wellfield, CPP, G&A, reclamation; LOM capital $264.2M; >14 Mlb recovered","year":2025},"permitting_stage":"All federal permits complete (FAST-41; NRC licence renewed to June 2046, EPA UIC permits Oct 2025, BLM Plan of Operations June 2026); South Dakota state permits (large-scale mine, water rights, groundwater discharge) in process since June 2026","note":"Federal permitting finished 30 Jun 2026 and BLM authorised initial infrastructure on 240 acres, but state permitting is the gate: enCore says 'we anticipate development in 2028, subject to receiving permits from the state' (Q2 2026). No first-production date; ","rg":"North America","own":{"North America":100}},{"id":"gas-hills","name":"Gas Hills (enCore)","short":"Gas Hills (enCore)","country":"United States","iso2":"US","region":"Wyoming (Gas Hills district, Fremont/Natrona Counties)","lat":42.8,"lon":-107.55,"operator":"enCore Energy","owners":[{"name":"enCore Energy","pct":100}],"tickers":["EU"],"method":"ISR","status":"proposed","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2030,"late":2035},"planned_output_tu":{"low":190,"base":385,"high":385},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":40.61,"basis":"PEA (WWC Engineering, effective 31 Dec 2024): pre-income-tax all-in cost incl. royalties, taxes, opex and capex; initial capex $55.2M; $87/lb price deck","year":2024},"permitting_stage":"PEA stage; ISR permitting started (early stage); ~US$15M reclamation bonding required before licensing","note":"PEA: 1.0 Mlb/yr for 11 years, 6.16 Mlb recovered. enCore's cash is tight (US$5.1M cash + US$33.6M securities at 30 Sep 2026; 20% workforce cut July 2026) and South Texas plus Dewey Burdock come first, so the start-year range is est. Resources = WNA M&I 4,140 t","rg":"North America","own":{"North America":100}},{"id":"goliad","name":"Goliad","short":"Goliad","country":"United States","iso2":"US","region":"Texas (Goliad County)","lat":28.87,"lon":-97.34,"operator":"Uranium Energy Corp","owners":[{"name":"Uranium Energy Corp","pct":100}],"tickers":["UEC"],"method":"ISR","status":"proposed","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":385,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2028,"late":2032},"planned_output_tu":{"low":100,"base":190,"high":385},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published","year":null},"permitting_stage":"Fully permitted since 2011-12; radioactive material licence renewed March 2024; no construction decision","note":"Permitted satellite to the Hobson CPP (6.2 Mlb M&I). UEC lists it as 'near-term production' but has given no start date; Burke Hollow expansion has priority. Capacity = EIA 1.0 Mlb/yr. Start-year and output ranges are est. coords approx.","rg":"North America","own":{"North America":100}},{"id":"grants-precision-isr","name":"Grants Precision ISR (Mt Taylor)","short":"Grants Precision ISR (Mt Taylor)","country":"United States","iso2":"US","region":"New Mexico (Grants Mineral Belt, Cibola/McKinley Counties)","lat":35.336,"lon":-107.636,"operator":"Rio Grande Resources (General Atomics)","owners":[{"name":"General Atomics","pct":100}],"tickers":["GENERAL ATOMICS (private)"],"method":"ISR","status":"proposed","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2032,"late":2038},"planned_output_tu":null,"ramp_years":4,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published","year":null},"permitting_stage":"Announced Nov 2024; first uranium ISR project on the FAST-41 dashboard; state and federal permitting and licensing in progress","note":"General Atomics (owner of Heathgate/Beverley in Australia) plans to recover the Mt Taylor deposit by ISR instead of the closed conventional mine: company-stated 260 Mlb ISR resource (largest contiguous US uranium resource; not a compliant reserve), production ","rg":"North America","own":{"North America":100}},{"id":"kingsville-dome","name":"Kingsville Dome CPP","short":"Kingsville Dome CPP","country":"United States","iso2":"US","region":"Texas (Kleberg County)","lat":27.42,"lon":-97.79,"operator":"enCore Energy","owners":[{"name":"enCore Energy","pct":100}],"tickers":["EU"],"method":"ISR","status":"care-maintenance","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":308,"first_production_year":1988,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published","year":null},"permitting_stage":"Licensed CPP on standby since 2009; EIA reclassified it from 'standby' to 'reclamation' (capacity 0) at end-2025","note":"No production since June 2009 and wellfields restored. enCore's website still describes an 800 klb/yr standby CPP, but EIA lists the project as under reclamation with zero capacity from end-2025 and enCore has announced no restart or satellite feed; treat as v","rg":"North America","own":{"North America":100}},{"id":"la-sal-complex","name":"La Sal Complex (La Sal, Pandora, Beaver, Energy Queen)","short":"La Sal Complex","country":"United States","iso2":"US","region":"Utah (San Juan County, Uravan Mineral Belt)","lat":38.31,"lon":-109.24,"operator":"Energy Fuels","owners":[{"name":"Energy Fuels","pct":100}],"tickers":["UUUU"],"method":"underground","status":"operating","production_tu":{},"capacity_tu":null,"first_production_year":2023,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published; described by Energy Fuels as lower-grade, higher-cost than Pinyon Plain","year":null},"permitting_stage":null,"note":"Feeder mines for White Mesa (uranium + vanadium) - production_tu null to avoid double counting. La Sal and Pandora resumed mining Dec 2023 after standby since 2012. Contained U3O8 mined is est. by subtraction from company totals: ~190 klb in 2025 (1.72 Mlb tot","rg":"North America","own":{"North America":100}},{"id":"lance","name":"Lance (Ross CPP)","short":"Lance (Ross CPP)","country":"United States","iso2":"US","region":"Wyoming (Powder River Basin, Crook County)","lat":44.575,"lon":-104.955,"operator":"Peninsula Energy (Strata Energy Inc.)","owners":[{"name":"Peninsula Energy","pct":100}],"tickers":["PEN.AX"],"method":"ISR","status":"ramp-up","production_tu":{"2019":13,"2020":0,"2021":1,"2022":2,"2023":1,"2024":1,"2025":5},"capacity_tu":769,"first_production_year":2016,"planned_start_year":2024,"start_year_range":{"early":2024,"late":2024},"planned_output_tu":{"low":115,"base":231,"high":460},"ramp_years":4,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published for current operations","year":null},"permitting_stage":"Operating; only US low-pH (acid) ISR operation; MU-4 header houses being brought online","note":"Low-pH restart began Dec 2024 but ramp-up keeps slipping: CY2025 guidance cut to <=50 klb (actual 13.7 klb captured), CY2026 guidance of 400-500 klb withdrawn 22 Jul 2026 (gas generation, low flow rates); Jan-Sep 2026 captured ~31-36 klb (12-14 tU). CY2027 gui","rg":"North America","own":{"Australia":100}},{"id":"lost-creek","name":"Lost Creek","short":"Lost Creek","country":"United States","iso2":"US","region":"Wyoming (Great Divide Basin, Sweetwater County)","lat":42.13,"lon":-107.86,"operator":"Ur-Energy (Lost Creek ISR LLC)","owners":[{"name":"Ur-Energy","pct":100}],"tickers":["URG"],"method":"ISR","status":"operating","production_tu":{"2019":18,"2020":4,"2021":0,"2022":0,"2023":9,"2024":96,"2025":158},"capacity_tu":769,"first_production_year":2013,"planned_start_year":null,"start_year_range":null,"planned_output_tu":{"low":150,"base":230,"high":385},"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":42.89,"aisc":null,"basis":"2025 actual cash cost per produced lb sold (incl. severance/ad valorem); produced cost incl. non-cash $52.62/lb; Jan-Sep 2026 cash $39.56, incl. non-cash $52.08","year":2025},"permitting_stage":null,"note":"Largest US ISR producer. Figures are lb drummed (EIA basis): 249,209 lb 2024, 410,440 lb 2025 (captured 265,746 / 370,893); Jan-Sep 2026 drummed 341,058 lb (131 tU). No 2026 production guidance (sales guidance 700 klb after 600 klb of deliveries deferred to 20","rg":"North America","own":{"North America":100}},{"id":"ludeman","name":"Ludeman","short":"Ludeman","country":"United States","iso2":"US","region":"Wyoming (Powder River Basin, Converse County)","lat":42.9,"lon":-105.63,"operator":"Uranium Energy Corp","owners":[{"name":"Uranium Energy Corp","pct":100}],"tickers":["UEC"],"method":"ISR","status":"development","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":null,"planned_start_year":2027,"start_year_range":{"early":2027,"late":2028},"planned_output_tu":{"low":100,"base":200,"high":385},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published","year":null},"permitting_stage":"Licensed/permitted satellite; first wellfield wells under construction and MIT testing, IX plant contractor selected (Sept 2026)","note":"UEC's third Wyoming ISR mine, a satellite trucking loaded resin to the Irigaray CPP; company targets a 2027 start-up. As of the FY2026 report (29 Sep 2026): monitor/injection/recovery wells being installed in wellfield 1, long-lead IX equipment procured, plant","rg":"North America","own":{"North America":100}},{"id":"moore-ranch","name":"Moore Ranch","short":"Moore Ranch","country":"United States","iso2":"US","region":"Wyoming (Powder River Basin, Campbell County)","lat":43.57,"lon":-105.85,"operator":"Uranium Energy Corp","owners":[{"name":"Uranium Energy Corp","pct":100}],"tickers":["UEC"],"method":"ISR","status":"proposed","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":1154,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2029,"late":2034},"planned_output_tu":{"low":80,"base":150,"high":250},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published","year":null},"permitting_stage":"NRC licence issued Oct 2010 (EIA: partially permitted and licensed); development suspended, no stated schedule","note":"Licensed satellite project acquired with Uranium One Americas (2021); small resource (3.2 Mlb M&I) so short life. No start date from UEC. Capacity is the EIA-listed licensed figure (3.0 Mlb/yr), far above what the resource supports; output and start-year range","rg":"North America","own":{"North America":100}},{"id":"nichols-ranch","name":"Nichols Ranch (incl. Jane Dough, Hank)","short":"Nichols Ranch","country":"United States","iso2":"US","region":"Wyoming (Powder River Basin, Johnson/Campbell Counties)","lat":43.71,"lon":-106.01,"operator":"Energy Fuels (Uranerz Energy Corp.)","owners":[{"name":"Energy Fuels","pct":100}],"tickers":["UUUU"],"method":"ISR","status":"care-maintenance","production_tu":{"2019":27,"2020":2,"2021":0,"2022":0,"2023":1,"2024":0,"2025":0},"capacity_tu":769,"first_production_year":2014,"planned_start_year":2027,"start_year_range":{"early":2027,"late":2030},"planned_output_tu":{"low":60,"base":115,"high":190},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published","year":null},"permitting_stage":"Fully licensed (Nichols Ranch, Jane Dough, Hank); on standby; 2026 delineation drilling and updated technical report due late 2026","note":"On standby since wellfields depleted in Q1 2020; trace recoveries since (EIA). 2019 = Energy Fuels' 70,000 lb company total (all Nichols Ranch); 2021 is H2 only. Energy Fuels says Nichols Ranch + Whirlwind could add up to ~600 klb/yr 'as early as 2027', market","rg":"North America","own":{"North America":100}},{"id":"palangana-hobson","name":"Palangana ISR / Hobson CPP","short":"Palangana ISR / Hobson CPP","country":"United States","iso2":"US","region":"Texas (Duval County; Hobson plant in Karnes County)","lat":27.68,"lon":-98.4,"operator":"Uranium Energy Corp","owners":[{"name":"Uranium Energy Corp","pct":100}],"tickers":["UEC"],"method":"ISR","status":"care-maintenance","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":385,"first_production_year":2010,"planned_start_year":null,"start_year_range":{"early":2027,"late":2031},"planned_output_tu":{"low":20,"base":40,"high":80},"ramp_years":1,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published","year":null},"permitting_stage":"Fully permitted; Palangana mine-area permit renewed March 2024; satellite on standby","note":"Palangana produced 2010-2015 and has been idle since; small remaining resource (0.64 Mlb indicated + 1.0 Mlb inferred), no restart date from UEC. The Hobson CPP (licensed 4 Mlb/yr, ~28.945,-97.97) restarted in May 2026 to process Burke Hollow resin - that outp","rg":"North America","own":{"North America":100}},{"id":"pinyon-plain","name":"Pinyon Plain (formerly Canyon Mine)","short":"Pinyon Plain","country":"United States","iso2":"US","region":"Arizona (Coconino County, south of Grand Canyon)","lat":35.883,"lon":-112.096,"operator":"Energy Fuels","owners":[{"name":"Energy Fuels","pct":100}],"tickers":["UUUU"],"method":"underground","status":"operating","production_tu":{},"capacity_tu":null,"first_production_year":2023,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":2028,"cost_usd_lb":{"cash":23,"aisc":null,"basis":"2026 actual incl. milling at White Mesa: mining+transport ~$14/lb + milling ~$9/lb recovered U3O8 (guided $23-30/lb)","year":2026},"permitting_stage":null,"note":"Feeder mine for White Mesa - production_tu null to avoid double counting (finished U3O8 is on the mill record). Ore mined contained ~1.53 Mlb U3O8 in 2025 at 1.62% eU3O8 (one of the highest-grade US mines) and ~625 klb in H1 2026 at ~0.91%; Energy Fuels mined ","rg":"North America","own":{"North America":100}},{"id":"reno-creek","name":"Reno Creek","short":"Reno Creek","country":"United States","iso2":"US","region":"Wyoming (Powder River Basin, Campbell County)","lat":43.68,"lon":-105.6,"operator":"Uranium Energy Corp","owners":[{"name":"Uranium Energy Corp","pct":100}],"tickers":["UEC"],"method":"ISR","status":"proposed","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":769,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2029,"late":2033},"planned_output_tu":{"low":330,"base":500,"high":770},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published by UEC","year":null},"permitting_stage":"Fully permitted: WDEQ permit to mine (2015) and NRC source material licence (2017) for up to 2 Mlb/yr; no construction decision","note":"UEC's largest permitted Wyoming resource (26 Mlb M&I) but no start date or construction decision; not mentioned in UEC's 2026 quarterly updates, which prioritise Christensen Ranch, Ludeman and Sweetwater. Planned output from the earlier AUC pre-feasibility con","rg":"North America","own":{"North America":100}},{"id":"roca-honda","name":"Roca Honda","short":"Roca Honda","country":"United States","iso2":"US","region":"New Mexico (Grants Mineral Belt, McKinley County)","lat":35.36,"lon":-107.7,"operator":"Energy Fuels","owners":[{"name":"Energy Fuels","pct":100}],"tickers":["UUUU"],"method":"underground","status":"proposed","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2031,"late":2037},"planned_output_tu":{"low":700,"base":1000,"high":1039},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published on current basis","year":null},"permitting_stage":"'Advanced stages of permitting' (US Forest Service EIS / New Mexico mine permit outstanding); 2022 S-K 1300 technical report","note":"Largest and highest-grade undeveloped Energy Fuels uranium project: M&I 17.6 Mlb at 0.48% + inferred 13.8 Mlb; up to 2.7 Mlb/yr over a 9-year mine life, with ore trucked to White Mesa (so future finished output would physically appear at the mill; kept here as","rg":"North America","own":{"North America":100}},{"id":"rosita","name":"Rosita CPP","short":"Rosita CPP","country":"United States","iso2":"US","region":"Texas (Duval County)","lat":27.83,"lon":-98.38,"operator":"enCore Energy","owners":[{"name":"enCore Energy","pct":100}],"tickers":["EU"],"method":"ISR","status":"care-maintenance","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":31,"2025":0},"capacity_tu":308,"first_production_year":1990,"planned_start_year":2026,"start_year_range":{"early":2026,"late":2027},"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published separately (see Alta Mesa for enCore company-wide extraction cost)","year":null},"permitting_stage":"Fully licensed 800 klb/yr CPP (expandable); EIA status 'standby' since end-2025","note":"Restarted Nov 2023 on the Rosita Extension wellfield, drummed 80,725 lb in 2024 (EIA), then idle through 2025-Q3 2026. Resumes as the processing hub for Upper Spring Creek resin from Dec 2026 - that future output is carried on the Upper Spring Creek record to ","rg":"North America","own":{"North America":100}},{"id":"sheep-mountain","name":"Sheep Mountain","short":"Sheep Mountain","country":"United States","iso2":"US","region":"Wyoming (Crooks Gap, Fremont County)","lat":42.4,"lon":-107.82,"operator":"Energy Fuels","owners":[{"name":"Energy Fuels","pct":100}],"tickers":["UUUU"],"method":"heap-leach","status":"proposed","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2031,"late":2037},"planned_output_tu":{"low":385,"base":500,"high":577},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published on current basis","year":null},"permitting_stage":"State mine permit issued 2015; Energy Fuels describes it as fully permitted for mining; ore processing route (heap leach licence or off-site) unresolved; EIA 'inactive' in 2026","note":"Open-pit + underground project with on-site heap leach in the PFS: up to 1.5 Mlb/yr over ~15 years; probable reserves 18.4 Mlb. Energy Fuels calls it fully permitted for mining and is 'evaluating ore processing options'; groups it with Roca Honda and Bullfrog ","rg":"North America","own":{"North America":100}},{"id":"shirley-basin","name":"Shirley Basin","short":"Shirley Basin","country":"United States","iso2":"US","region":"Wyoming (Shirley Basin, Carbon County)","lat":42.37,"lon":-106.18,"operator":"Ur-Energy (Pathfinder Mines Corp.)","owners":[{"name":"Ur-Energy","pct":100}],"tickers":["URG"],"method":"ISR","status":"ramp-up","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":385,"first_production_year":2026,"planned_start_year":2026,"start_year_range":{"early":2026,"late":2026},"planned_output_tu":{"low":150,"base":300,"high":385},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not yet published for operations","year":null},"permitting_stage":"Fully permitted; WDEQ authorised full operations and resin transport in late June 2026","note":"Satellite (IX only) to the Lost Creek plant. Recovery began April 2026; first loaded-resin shipment to Lost Creek 19 Aug 2026. Captured 10,634 lb in Q2 and 14,697 lb in Q3 2026 (25,330 lb YTD, ~10 tU) from a small part of Mine Unit 1; more header houses throug","rg":"North America","own":{"North America":100}},{"id":"shootaring-canyon-mill","name":"Shootaring Canyon Mill","short":"Shootaring Canyon Mill","country":"United States","iso2":"US","region":"Utah (Garfield County, near Ticaboo)","lat":37.71,"lon":-110.69,"operator":"Anfield Energy","owners":[{"name":"Anfield Energy","pct":100}],"tickers":["AEC"],"method":"underground","status":"care-maintenance","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":1154,"first_production_year":1982,"planned_start_year":null,"start_year_range":{"early":2028,"late":2031},"planned_output_tu":{"low":120,"base":243,"high":385},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published on current basis","year":null},"permitting_stage":"Utah DWMRC issued draft renewed radioactive materials licence and groundwater permit 21 Oct 2026; public comment late 2026/early 2027; final licence targeted Q2 2027","note":"MILL record (conventional, 750 st/d; refurbishment plan 1,000 st/d plus vanadium circuit) on standby since 1982 - future U3O8 from Velvet-Wood and other Anfield mines belongs here. Draft licence caps output at 3 Mlb U3O8/yr; major refurbishment targeted to sta","rg":"North America","own":{"North America":100}},{"id":"smith-ranch-highland","name":"Smith Ranch-Highland (incl. North Butte)","short":"Smith Ranch-Highland","country":"United States","iso2":"US","region":"Wyoming (Powder River Basin, Converse County)","lat":43.05,"lon":-105.68,"operator":"Cameco Resources (Power Resources Inc.)","owners":[{"name":"Cameco","pct":100}],"tickers":["CCJ"],"method":"ISR","status":"care-maintenance","production_tu":{"2021":2,"2022":8,"2023":8,"2024":5,"2025":9},"capacity_tu":2116,"first_production_year":1975,"planned_start_year":null,"start_year_range":{"early":2029,"late":2035},"planned_output_tu":{"low":300,"base":600,"high":1154},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published (assets fully impaired; care & maintenance)","year":null},"permitting_stage":"Licensed (state licence term through Sept 2028); wellfield development deferred since 2016; no restart decision","note":"Curtailed 2016, no commercial production since 2018; EIA still records small restoration-related recoveries (13,432 lb 2024; 23,577 lb 2025; 24,128 lb Jan-Sep 2026). 2021 figure is Q3-Q4 only (EIA published facility data from Q3 2021); 2019-20 not disclosed. C","rg":"North America","own":{"North America":100}},{"id":"sunday-mine-complex","name":"Sunday Mine Complex","short":"Sunday Mine Complex","country":"United States","iso2":"US","region":"Colorado (San Miguel County, Uravan Mineral Belt)","lat":38.07,"lon":-108.82,"operator":"Western Uranium & Vanadium","owners":[{"name":"Western Uranium & Vanadium","pct":100}],"tickers":["WUC.CN"],"method":"underground","status":"ramp-up","production_tu":{},"capacity_tu":null,"first_production_year":2021,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published","year":null},"permitting_stage":"Mines fully permitted; company's own Mustang mill (1,000 st/d, former Pinon Ridge site) - licence application due end-2026, CDPHE review through 2027","note":"Small intermittent uranium-vanadium mining; production_tu null because ore was sold to Energy Fuels and milled at White Mesa (ore delivery programme under the April 2025 Ore Purchase Agreement concluded by mid-2026, final assays >40% above probe grades; tonnag","rg":"North America","own":{"North America":100}},{"id":"sweetwater","name":"Sweetwater mill & ISR complex (incl. JAB/Antelope)","short":"Sweetwater mill & ISR complex","country":"United States","iso2":"US","region":"Wyoming (Great Divide Basin, Sweetwater County)","lat":42.053,"lon":-107.908,"operator":"Uranium Energy Corp","owners":[{"name":"Uranium Energy Corp","pct":100}],"tickers":["UEC"],"method":"ISR","status":"development","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":1577,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2028,"late":2031},"planned_output_tu":{"low":200,"base":385,"high":770},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published","year":null},"permitting_stage":"FAST-41 (Aug 2025); BLM Plan of Operations in NEPA since June 2026 - EA expected Mar 2027, approval May 2027; EIA status 'partially permitted and licensed'","note":"Bought from Rio Tinto Dec 2024 (US$175M) as UEC's third hub: 3,000 st/d conventional mill (standby since 1983, licensed 4.1 Mlb/yr) plus ISR-amenable ground. UEC is delineating the first ISR wellfields (Sweetwater North), fabricating IX vessels and has Wood as","rg":"North America","own":{"North America":100}},{"id":"tony-m","name":"Tony M","short":"Tony M","country":"United States","iso2":"US","region":"Utah (Garfield County, Henry Mountains)","lat":37.78,"lon":-110.72,"operator":"IsoEnergy","owners":[{"name":"IsoEnergy","pct":null}],"tickers":["ISOU"],"method":"underground","status":"care-maintenance","production_tu":{},"capacity_tu":null,"first_production_year":2007,"planned_start_year":null,"start_year_range":{"early":2027,"late":2030},"planned_output_tu":null,"ramp_years":1,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published","year":null},"permitting_stage":"Fully permitted past-producing mine; reopened for access July 2024; bulk sample (up to 2,000 t) started late Dec 2025; no restart decision found","note":"Produced 2007-08 under Denison; IsoEnergy (via the Consolidated Uranium merger) reopened the workings in 2024 and trucked a bulk sample to White Mesa under a toll-milling agreement to support a restart decision. NOT VERIFIED for late 2026: IsoEnergy's website ","rg":"North America","own":{"North America":100}},{"id":"upper-spring-creek","name":"Upper Spring Creek (Brown / Brevard areas)","short":"Upper Spring Creek","country":"United States","iso2":"US","region":"Texas (South Texas, Clay West uranium district)","lat":28.3,"lon":-98.15,"operator":"enCore Energy","owners":[{"name":"enCore Energy","pct":100}],"tickers":["EU"],"method":"ISR","status":"development","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0,"2025":0},"capacity_tu":385,"first_production_year":null,"planned_start_year":2026,"start_year_range":{"early":2026,"late":2027},"planned_output_tu":{"low":80,"base":190,"high":308},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published","year":null},"permitting_stage":"Radioactive materials licence amended; TCEQ PAA-1 issued 19 Nov 2026; waste disposal well (WDW-467) operating approval expected Dec 2026","note":"Satellite IX plant (1,600 gpm built, 3,200 gpm planned) and first wellfield are complete; injection and extraction expected the first week of Dec 2026, with resin trucked to the Rosita CPP. Start slipped through 2026 on TCEQ approvals; full-scale operation sti","rg":"North America","own":{"North America":100}},{"id":"velvet-wood","name":"Velvet-Wood","short":"Velvet-Wood","country":"United States","iso2":"US","region":"Utah (Lisbon Valley, San Juan County)","lat":38.12,"lon":-109.15,"operator":"Anfield Energy","owners":[{"name":"Anfield Energy","pct":100}],"tickers":["AEC"],"method":"underground","status":"development","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2027,"late":2029},"planned_output_tu":null,"ramp_years":2,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published on current basis (2016 PEA is outdated)","year":null},"permitting_stage":"Federal approval under the 14-day emergency fast-track (May 2025); ground broken Nov 2025; ATF blast permit June 2026; Utah concept approval for water treatment (Sept 2026); dewatering pending","note":"Past-producing uranium-vanadium mine (last output 1984) being reopened: first 700 ft of decline rehabilitated, first underground blast 27 Aug 2026, water-treatment plant nearly complete, then ~2-3 months to dewater old workings. No first-ore date given; ore ha","rg":"North America","own":{"North America":100}},{"id":"whirlwind","name":"Whirlwind","short":"Whirlwind","country":"United States","iso2":"US","region":"Colorado/Utah border (Mesa County CO / Grand County UT)","lat":38.64,"lon":-109.03,"operator":"Energy Fuels","owners":[{"name":"Energy Fuels","pct":100}],"tickers":["UUUU"],"method":"underground","status":"development","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":2027,"start_year_range":{"early":2027,"late":2029},"planned_output_tu":null,"ramp_years":1,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":"not published","year":null},"permitting_stage":"Fully permitted; decline dewatering and rehabilitation under way, completion expected in 2026","note":"Small uranium-vanadium feeder mine for White Mesa; rehabilitation expected complete in 2026 with potential production in 2027, market-dependent. Energy Fuels quotes only a combined figure: Whirlwind + Nichols Ranch could add up to ~600 klb/yr as early as 2027.","rg":"North America","own":{"North America":100}},{"id":"white-mesa-mill","name":"White Mesa Mill","short":"White Mesa Mill","country":"United States","iso2":"US","region":"Utah (San Juan County, near Blanding)","lat":37.536,"lon":-109.503,"operator":"Energy Fuels","owners":[{"name":"Energy Fuels","pct":100}],"tickers":["UUUU"],"method":"underground","status":"operating","production_tu":{"2019":0,"2020":73,"2021":0,"2022":62,"2023":0,"2024":61,"2025":390},"capacity_tu":3000,"first_production_year":1980,"planned_start_year":null,"start_year_range":null,"planned_output_tu":{"low":400,"base":770,"high":1150},"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":23,"aisc":null,"basis":"2026 actual for Pinyon Plain ore in the H1 mill run: mining+transport ~$14/lb + milling ~$9/lb recovered (guided $23-30); finished inventory carried at ~$43/lb at end-2025; La Sal/Pandora feed is higher cost","year":2026},"permitting_stage":null,"note":"Only operating conventional uranium mill in the US; MILL record carrying all finished U3O8 from its feeder mines (Pinyon Plain, La Sal/Pandora, third-party ore, alternate feed) - feeder records have null production to avoid double counting. Campaign milling: 1","guidance_tu":{"2026":{"low":577,"high":962}},"rg":"North America","own":{"North America":100}},{"id":"arnasay","name":"Arnasay (Arnasoy)","short":"Arnasay (Arnasoy)","country":"Uzbekistan","iso2":"UZ","region":"Jizzakh region (Forish district)","lat":40.8,"lon":67.3,"operator":"Navoiyuran","owners":[{"name":"Navoiyuran State Enterprise (Republic of Uzbekistan, Ministry of Mining Industry and Geology)","pct":100}],"tickers":["NAVOIYURAN (state)"],"method":"ISR","status":"development","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2027,"late":2030},"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":"Licence 9 Jan 2025 - 9 Jan 2035 (pilot well testing); President ordered the feasibility study finalised (Dec 2025); listed by the company as a key development project for 2026","note":"New deposit outside the Kyzylkum core; JORC mineral resources 9,039 t (no reserves yet). No start date or design output has been published - start range is my est. based on Qizilkok's roughly two years from pilot wells to commercial output. Any pilot tonnage w","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"navoiyuran-isr-operations","name":"Navoiyuran ISR operations (national aggregate; Navoi hydrometallurgical plant)","short":"Navoiyuran","country":"Uzbekistan","iso2":"UZ","region":"Navoi / Bukhara / Samarkand regions (Central Kyzylkum)","lat":40.1,"lon":65.37,"operator":"Navoiyuran","owners":[{"name":"Navoiyuran State Enterprise (Republic of Uzbekistan, Ministry of Mining Industry and Geology)","pct":100}],"tickers":["NAVOIYURAN (state)"],"method":"ISR","status":"operating","production_tu":{"2019":3500,"2020":3512,"2021":3526,"2022":3561,"2023":4050,"2024":5200,"2025":7000},"capacity_tu":null,"first_production_year":1964,"planned_start_year":null,"start_year_range":null,"planned_output_tu":{"low":7100,"base":8900,"high":15000},"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":26,"aisc":34.3,"basis":"2025 actual, company-wide Total Cash Cost / AISC (Navoiyuran investor presentation May 2026; 2024: 23.9 / 32.0)","year":2025},"permitting_stage":null,"note":"AGGREGATE of all Navoiyuran mining units (sub-records carry no production; do not double count). 2020-2025 are company/Red Book actuals: 5,200 tU in 2024 and 7,000 tU in 2025 (+35%) are Navoiyuran's own figures, repeated by S&P and Red Book 2026 (Red Book 2023","guidance_tu":{"2026":{"low":7350,"high":7500}},"rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"navoiyuran-nurabad-mining-unit","name":"Nurabad Mining Unit (Southern; Sabyrsay, Ingichki, Agron)","short":"Nurabad","country":"Uzbekistan","iso2":"UZ","region":"Samarkand region (Nurabad)","lat":39.61,"lon":66.28,"operator":"Navoiyuran","owners":[{"name":"Navoiyuran State Enterprise (Republic of Uzbekistan, Ministry of Mining Industry and Geology)","pct":100}],"tickers":["NAVOIYURAN (state)"],"method":"ISR","status":"operating","production_tu":{},"capacity_tu":null,"first_production_year":1966,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"Sub-record: output is not published by unit and is counted in navoiyuran-isr-operations (do not double count). Former Southern Mining Directorate; ISL at Sabyrsay, Ingichki and Agron (Sabyrsay mined underground 1966-83, ISL since). resources_tu = 5,036 tU in s","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"navoiyuran-uchkuduk-mining-unit","name":"Uchkuduk Mining Unit (Northern; Uchkuduk, Meylisay)","short":"Uchkuduk","country":"Uzbekistan","iso2":"UZ","region":"Navoi region (Uchkuduk, northern Kyzylkum)","lat":42.157,"lon":63.556,"operator":"Navoiyuran","owners":[{"name":"Navoiyuran State Enterprise (Republic of Uzbekistan, Ministry of Mining Industry and Geology)","pct":100}],"tickers":["NAVOIYURAN (state)"],"method":"ISR","status":"operating","production_tu":{},"capacity_tu":null,"first_production_year":1964,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"Sub-record: output is not published by unit and is counted in navoiyuran-isr-operations (do not double count). Former Northern Mining Directorate; operates Uchkuduk, Meylisay and Qizilkok (Qizilkok has its own record). resources_tu = JORC ore reserves at 1 Jan","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"navoiyuran-zafarabad-mining-unit","name":"Zafarabad Mining Unit (former Mining Directorate No. 5; Bukinay group, Sugraly, Kanimekh)","short":"Zafarabad","country":"Uzbekistan","iso2":"UZ","region":"Navoi / Bukhara regions (central Kyzylkum)","lat":40.53,"lon":65.03,"operator":"Navoiyuran","owners":[{"name":"Navoiyuran State Enterprise (Republic of Uzbekistan, Ministry of Mining Industry and Geology)","pct":100}],"tickers":["NAVOIYURAN (state)"],"method":"ISR","status":"operating","production_tu":{},"capacity_tu":null,"first_production_year":1970,"planned_start_year":null,"start_year_range":null,"planned_output_tu":null,"ramp_years":null,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"Sub-record: output is not published by unit and is counted in navoiyuran-isr-operations (do not double count). Largest of the three units: 17 ISL deposits (North/South Bukinay, Istiklol, Kukhnur, Aulbek, North Kanimekh, Sugraly/South Sugraly, Aktau, Maybulak, ","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"qizilkok","name":"Qizilkok (Kyzylkok)","short":"Qizilkok (Kyzylkok)","country":"Uzbekistan","iso2":"UZ","region":"Navoi region (eastern Kyzylkum)","lat":41.9,"lon":64.4,"operator":"Navoiyuran","owners":[{"name":"Navoiyuran State Enterprise (Republic of Uzbekistan, Ministry of Mining Industry and Geology)","pct":100}],"tickers":["NAVOIYURAN (state)"],"method":"ISR","status":"ramp-up","production_tu":{},"capacity_tu":1200,"first_production_year":2024,"planned_start_year":null,"start_year_range":null,"planned_output_tu":{"low":null,"base":1200,"high":null},"ramp_years":null,"expected_end_year":2041,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":null,"note":"Commercial production declared April 2026 (pilot wells from Dec 2024); planned 1,200 tU/yr for 15 years using low-reagent oxygen ISL. JORC at 1 Jan 2026: 9,422 t ore reserves, 10,878 t resources; third-largest deposit in the portfolio; mining licence to Jan 20","rg":"Russia and Central Asia","own":{"Russia and Central Asia":100}},{"id":"south-djengeldi-nurlikum","name":"South Djengeldi (Nurlikum Mining JV)","short":"South Djengeldi","country":"Uzbekistan","iso2":"UZ","region":"Navoi region (Tomdi district, Kyzylkum)","lat":40.95,"lon":63.35,"operator":"Navoiyuran (project operator for Nurlikum Mining LLC)","owners":[{"name":"Orano","pct":45},{"name":"Navoiyuran","pct":45},{"name":"ITOCHU Corporation","pct":10}],"tickers":["ORANO (private)","NAVOIYURAN (state)","8001.T"],"method":"ISR","status":"development","production_tu":{"2019":0,"2020":0,"2021":0,"2022":0,"2023":0,"2024":0},"capacity_tu":null,"first_production_year":null,"planned_start_year":2026,"start_year_range":{"early":2026,"late":2027},"planned_output_tu":{"low":500,"base":500,"high":700},"ramp_years":3,"expected_end_year":null,"cost_usd_lb":{"cash":null,"aisc":null,"basis":null,"year":null},"permitting_stage":"Production licence issued 26 Feb 2025 (valid to 2035); JV restructured Oct 2025 (Orano 45 / Navoiyuran 45 / ITOCHU 10) with Navoiyuran as operator; industrial development under way","note":"JV was 51/49 Orano/state until ITOCHU joined (agreement 10 Mar 2025, completed Oct 2025). Plan: about 500 tU/yr average, 700 tU/yr peak, 10+ year life; phase 1 about US$214M over three years (company: ~US$100M initial of >US$200M life-of-mine). Original target","rg":"Russia and Central Asia","own":{"Europe":45,"Russia and Central Asia":45,"Other Asia and Middle East":10}},{"id":"muntanga","name":"Muntanga","short":"Muntanga","country":"Zambia","iso2":"ZM","region":"Southern Province (Siavonga / Chirundu, Karoo basin)","lat":-16.3,"lon":28.4,"operator":"Atomic Eagle (formerly GoviEx Uranium)","owners":[{"name":"Atomic Eagle (formerly GoviEx Uranium)","pct":100}],"tickers":["AEU"],"method":"heap-leach","status":"proposed","production_tu":{},"capacity_tu":null,"first_production_year":null,"planned_start_year":null,"start_year_range":{"early":2030,"late":2034},"planned_output_tu":{"low":null,"base":846,"high":846},"ramp_years":2,"expected_end_year":null,"cost_usd_lb":{"cash":32.2,"aisc":47.3,"basis":"Feasibility Study (Jan-Mar 2025; independently reviewed and re-released under JORC Mar 2026); AISC per WNA","year":2025},"permitting_stage":"Mining licences held (Muntanga, Dibbwi, Chirundu, Kariba Valley); ESIA filed with ZEMA Sept 2025 and approved June 2026 (per WNA). No FID; company is drilling to grow resources and re-optimising before seeking finance.","note":"Open-pit, acid heap-leach project now owned by Atomic Eagle (GoviEx + Tombador Iron merger, ASX listing Nov 2025). FS: 2.2 Mlb U3O8/yr (846 tU) for ~12 years (25.3 Mlb LOM), capex US$282M, C1 US$32.2/lb, post-tax IRR 20.8%; maiden reserve 28.0 Mlb; resource 58","rg":"Africa","own":{"Africa":100}}]